Laserfiche WebLink
F •t 1 of 4 <br />~orado Division of Minerals and Geology <br />RELLANATION COST SUMMARY FORM <br />_____________________________ <br />_____________________________ <br />PERMIT NUMBER M-91-146 PREP. BY: 555 FILENAME: M146-0 <br />DATE 10-May-99 OPERATION: 2mk Gravel Pit <br />PERMIT ACTION Routine Bond Recalculation <br />GRAND TOTAL BOND AMOUNT 516,784 <br />1. DIRECT COSTS =___________ <br />________________________________________________________________________ <br />________________________________________________________________ _______ <br />A. EARTHWORK - BACKFILLING 8 ROUGH GRADING <br />Task No.~ Task Description ~ Cost (E) <br />______.._I___________________________________~______________I ____________ <br />1a ~ Regrade all slopes of Phase II Area, assuming ~ 5705 <br />2300 feet of 10 foot banks reduced to 3:1 slopes <br />by cu[ and fill methods. <br />2a ~ Remove temporary river diversion and re-estabLi sh~ 5209 <br />I central berm. I <br />3a ~ Remove the temporary Phase I area crossing, ~ 5421 <br />~ including 2 48" culverts (free to contractor). ~ <br />Subtotal (A): f1,334 <br />B . EARTHWORK - HI GHWALL REDUCTION <br />Task <br />____ No.l <br />____I________ Task Description <br />________,.________.,_________..________ ~ Lost (E) <br />______I___.,________ <br />Subtotal (B): <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task <br />_____ No.~ <br />~__I________ <br />______ Task Description <br />___________..__________________ ~ Cost (E) <br />________________ <br />Subtotal (C ): <br />