My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112459
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:48 PM
Creation date
11/24/2007 9:32:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Permit File
Doc Date
3/7/2003
Doc Name
pages 342 to 453
Section_Exhibit Name
Section 2.05 Operation Plan Part 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)~drograph Response 5ha~ <br /> <br /> <br />• <br />A unit hydrograph is chosen for each drainage area or sub-area model to predict the runoff <br />response. The hydrograph responses available in the SEDCAD+ model are slow, medium and <br />fast. A slow response corresponds to a forested area or an area with a number of obstruttions, <br />whereas a fast response corresponds to an unvegetated or poorly protected area. Fast and <br />medium hydrograph responses were chosen for disturbed and undisturbed areas, respettively. <br />Drainage Basin Area <br />The drainage areas are determined by dirett measurement by planimetering from a 1"-200' scale <br />map. The maximum (worst case) areas were measured. <br />Areas measured are as follows: <br />Drainage $[ruc[ure Section Drainage Area <br />(ac) <br />Watershed Diversion N1 A, B 9.3 <br /> C 10.5 <br />Watershed Diversion N2 A, B 12.9 <br /> C 18.2 <br />Watershed Diversion N3 A 20.9 <br />Watershed Diversion N4 B 20.3 <br />Refuse Sediment <br />Collection Ditch No. 1 A, B, C 15.4 <br />Mine Bench Area (10-yr, 24hr runoff) 7.6 <br />Refuse Sedimen[ <br />CoBec[ion Ditch No. 2 All 4.5 <br />Yard Ditch N2 A 0.55 <br />Time of Concentration. Tc <br />Time of concentration is calculated by using the SCS Upland Method. All hydraulic leng[hs, <br />drainage heights and slopes are measured directly from a I"-200' scale map. The values <br />calculated for time of concentration are summarized as follows: <br />Drainage Structure Time of Concentration (hrs) <br />Watershed Diversion N1 0.028 <br />Watershed Diversion N2 0.033 <br />Watershed Diversion N3 Subaatershed 1 0.087 <br />Watershed Diversion NJ Subwatershed 2 0.087 <br />Watershed Diversion N4 0.051 <br />Refuse Sediment Collection Ditch NO. 1 0.108 <br />Mine Bench area (10.yr, 24-hr runoff) 0.041 <br />Refuse Sediment Collection Ditch No. 2 0.108 <br />Yard Ditch 2 0.016 <br />c~moRKUSenraov.rtev 358Re Revised - Ma 1993 <br />CS/IN9] Spm y <br />
The URL can be used to link to this page
Your browser does not support the video tag.