Laserfiche WebLink
2.3 Topsoil Management Program ................................................ 2.37 <br /> 2.3.1 Topsoil Availability ................................................. 2.38 <br /> 2.3.2 Topsoil Removal ................................................. 2.38 <br /> 2.3.3 Topsoil Handling ................................................. 2.39 <br /> 2.3.4 Topsoil Stockpile Design and Management ................. 2.39 <br />2.4 Mining Hydrology ..................................................................... 2.41 <br /> 2.4.1 Surface Water Hydrologic Controls ....................... 2-41 <br /> 2.4.2 Groundwater Inflow During Mining ...................... 2-43 <br /> 2.4.2.1 Probable Hydrologic Consequences ............... 2-44 <br /> 2.4.3 Water Requirements During Mining and Reclamation ..... 2.47 <br /> 2.4.4 Hydrologic Control Designs ....................................... 2-47 <br /> 2.4.4.1 Sedimentation Pond Design ............................ 2.47 <br /> 2.4.4.2 Alternate Sediment Controls ............................ 2-49 <br /> 2.4.5 Erosion Control Considerations ............................ 2.51 <br /> 2.4.5.1 Existing Erosion ....................................... 2-51 <br /> 2.4.5.2 Anticipated Soil Erosion and Control Measures ..... 2.51 <br />2.5 Geological Overview of the Mine Plan ........................................ 2-54 <br /> 2.5.1 Stratigraphy .............................................................. 2.54 <br /> 2.5.2 Structure .............................................................. 2-56 <br /> 2.5.3 Geologic Conditions .................................................... 2-58 <br />• 2.5.4 Reserve Estimates .................................................... 2-59 <br />3.0 Reclamation Plan ............................................................................. 3- 1 <br />3.1 Post Mining Topography ............................................................. 3. 6 <br />3.2 Topsoil Removal and Storage .................................................. 3- 7 <br />3.3 Topsoil Placement ............................................................. 3- 8 <br /> 3.3.1 Backfilling and Grading .................................................. 3-10 <br />3.4 Revegetation ........................................................................ 3-13 <br /> 3.4.1 Seedbed Preparation .................................................. 3-13 <br /> 3.4.2 Seed Mixture ............................................................. 3.13 <br /> 3.4.3 Seeding Techniques and Rates ............................. 3.13 <br /> 3.4.4 Mulching ............................................................ 3.14 <br /> 3.4.5 Planting Times ............................................................ 3.14 <br /> 3.4.6 Irrigation and Fertilization ........................................ 3.14 <br /> 3.4.7 Shrub and Tree Planting ........................................ 3-15 <br /> 3.4.8 Protection of Newly-seeded and Planted Areas ................ 3-16 <br /> 3.4.9 Evaluation of Revegetation ............................ 3-17 <br /> 3.4.10 Specialty and Crrtical Areas ............................ 3.18 <br />3.5 Final Hydrologic Restoration .................................................. 3.18 <br />3.6 Reclamation Schedule and Costs .................................................. 3.20 <br />3.7 Abandonment ....................................................................... 3-21 <br /> 3.7.1 Removal of Surface Structures :::::::::::::::::::::::::::: <br />3 <br />7 <br />2 Prevention of Public Hazards 3.21 <br />3.21 <br /> . <br />. <br />~ Volume 1 4 - 29 - 96 <br />