IIT E <br />PLAN <br />• <br />Compliance With Reclamation Performance Standards (cont.) <br />RECLAMATION TIMETABLE (cont.) <br />Within five years after final reclamation has begun,~the <br />following activities will be completed: <br />A. Sealing of adits, shafts and ventholes. <br />8. Removal of surface buildings .and structures. <br />C. Grading of waste dumps and other affected land. <br />D. Preparation of seedbed. <br />E. Re-seeding. <br /> <br />• -5- <br />