Laserfiche WebLink
Reclamation <br />All drill holes not completed as piezometers will be sealed immediately in accordance <br />with Rule 4.07.3(1) or (2 j, depending on whether water was encountered during drilling. <br />The piezometers will be part of along-tear monitoring program as MCC continues to <br />develop designs and plans for additional facilities in Sylvester Gulch. Upon reclamation <br />of the piezometers, they will be sealed in accordance with 4.07.3(2). The casing will be <br />cut below grade. <br />Roads and pads not associated with piezometers will be backfilled and graded, covered <br />with the stockpiled topsoil, and seeded and mulched with MCC's approved seed mix. <br />Roads and pads associated with piezometers will be reduced in size to enable access for <br />monitoring. These areas will be seeded and mulched to minimize erosion. Once the <br />piezometers have been sealed the roads and pads will be backfilled and graded, covered <br />with topsoil and seeded and mulched. <br /> <br />f <br />E.rhibi! 69 June 1997 <br />zsh69mr218 duc <br />