In addition, some of the soil boring locations have been specified to be drilled to bedrock. <br />The borings will be drilled until auger refusal is achieved, unless a boulder is responsible <br />for auger refusal. [f this occurs, the boulder may be cored or the boring may be offset <br />and redrilled to bedrock. A total of 34 bedrock holes will be drilled. <br />Rock samples will also be collected in Area 15. The rock will be cored using the wire- <br />line continuous coring method. <br />A'.:able (Table 1) is enclosed which provides a summary of the holes to be drilled and <br />their depths. <br />Earthwork and Sediment Control <br />As stated previously, it is difficult to estimate the actual amount of earthwork that will be <br />necessary to access the drilling locations. The enclosed table, Table 2, summazizes the <br />worst case earthwork that would be associated with the drilling program. Topsoil will be <br />windrowed along road corridors. Vegetation will be removed as necessary. Topsoil will <br />be removed from the drill pad area and stockpiled on the pad. <br />Surface water will be managed by ditches, culverts, and berms which will be constructed <br />along all new and existing roads. Any culverts installed for stream crossings will be <br />considered temporary. Sediment and erosion will be managed with silt fence, straw <br />bales, or other appropriate sediment control structure. <br />Area Specific Information <br />Area I: Area 1 is located in the vicinity of pond MB-5. The only equipment access to <br />this site is a low water crossing on the North Fork. Therefore, drilling in this area will <br />oa:ur late in the summer during low flow. <br />Area 2: This area is located on the west and east embankments of MB-2R. No road or <br />pad building will be necessary to access these drill sites. <br />Area 3: This area includes the Materials Storage Bench. No road or pad building will be <br />necessary to access these drill sites. <br />Area 4: Area 4 is located east of the Materials Storage Bench..Access to the drill <br />locations will be built from the road between the storage bench and the Sylvester Gulch <br />road. <br />Area 5: This area is located southwest of the RPE, on the east side of the Sylvester <br />Gulch road. The area will be accessed off of the new RPE haul road. Access roads and <br />drill pads will be required (see Table 2). <br />Area 6: Area 6 is located on either side of the lower Sylvester Gulch road. The area will <br />also be access from [he RPE haul road or the Sylvester Gulch road. Access roads and <br />drill pads will be required (see Table 2). <br />Erhrbit 69 June 1997 <br />e.~ch69mr218 doc <br />