Laserfiche WebLink
'~ <br />III IIIIIIIIIIIIIIII • <br />STATE ~ % <br />COLORADO <br />DlYl510N OF MINERALS AND GEOLOGY <br />Dcpanmem nl Nal oral Re>ources <br />141 S Shcrm, n SI .Room ? 1 5 <br /> <br />Drover. Colorado H0201 I~ <br />Phnnc l SO}I Hfi6-}567 I <br />FAX: (11141 H}?-H106 <br /> DEPARTMENT OF <br /> NATURAL <br />March 17, 1998 RESOURCES <br />Mr. James H. Kirkland a°" comer <br /> <br />Kirkland Construction, R. L. L. P. Governor <br /> <br />2101 Main Street lames LoihhraJ <br />Executive Du~cwr <br />P. O. Box 580 Michael H Lnnq <br /> <br />Rye, CO 81069 DlviAOn Dnectnr <br />Re: Two Rivers Pit, M-98-010, Permit Issuance -Construction Material Operation <br />Dear Mr. Kirkland: <br />On March 17, 1998 the Division of Minerals and Geology found Kirkland Construction, R.L.L.P. to have <br />satisfied the applicable requirements of C.R.S. 34-32.5-1O1 et ems. for obtaining a mining and reclamation <br />permit. Therefore, a permit is being issued. Two signed originals of the petmit have been executed. We <br />have kept one copy for our files and are enclosing one copy for your use. It is your responsibility to comply <br />with all of the tetras of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorpora[ed into the permit by reference. We presume that you have a copy of <br />all of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a <br />copy of the permit and the permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Ma[erials Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains <br />to Amendments, Rule 1.9 to Technical Revisions, and Rule 1. I 1 to Conversions. <br />3. On your permit anniversary date each year, March 17, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $350.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the con[act the Division. <br />Sincer ly, <br />MICHAEL B. O G ~MBi_ <br />Division Direc[or <br />MBL/JCS/8DC <br />Enclosure <br />M:\OSS1aDC\TEM P\AI A P'_SO I O.1C5 <br />