EXIb1T 3 - !::ininr Plan <br />Fade 2 <br />The contractor, upon setting up his operation, ~:+ill begin by removing <br />of topsoil with a dozer aid stockpiling it within the affected area, <br />Contractor may choose two different procedures in extraction of sand. <br />(a) A loader is utilized to begin removal of the sand, beginning at approx- <br />imate toe of old excavation and Progressing in north easterly direction <br />in a sv:eeping pattern; the loaded nr,,i.a,ent then places the sand onto a <br />hopper. <br />(h) A dozer stationed at the top of Idew Fit Area, pushing the sand into a <br />hcuper; the c~aterial in a hopt:er is conveyed onto a screen, r:hi.ch is located <br />in an irnmediz.te vicinity. <br />The screened material is moved onto aspahaltic batch plant that <br />processes the sand and produces the mix for the roadway. The mix is then <br />hauled off on designated haul road. <br />The :vhole process is confined in designated.r+ork area. <br /> <br />• <br />