Laserfiche WebLink
EXHIBIT B - Mining Plan <br />The overburden will be stripped and stockpiled for use in shaping up the area <br />after completion of the mining operation. This will be done with motor scrapers <br />and will be stockpiled in the pit area which was excavated prior to the 1973 <br />• Land Reclamation Act. The mining will be done with front end loader feeding <br />a crushing and screening plant. The new mining area will proceed from East to <br />Saest and the drainage will remain the same as it was prior to excavation. Surface <br />drainage in this area flows in a North Easterly direction and parallels the road <br />where the old arroya was. <br /> <br />