Laserfiche WebLink
EXHIBIT E - Reclmation Plan <br />Since the size of the operation is limited to 9 acres, the overburden and <br />topsoil will be stockpiled until completion of the excavation. There is an <br />area of this pit which was excavated prior to 1973 and which ~oill be used <br />• to store the topsoil and overburden until the gravel stock piles are removed. <br />Sde estimate 6 years with an average market for this material should deplete <br />this area. The back slopes when completed will be on a 3:1 slope or flatter <br />and the drainage will be from South East to North East. Seeding will be done <br />in accordance with Soil Conservation Service reccommendations. <br />C~ <br />