Laserfiche WebLink
<br />(C) Describe the timetable and plans to remove each <br />structure, if appropriate; and <br />(D) Include any geotechnical investigations, design, <br />and construction requirenents for the structure. <br />(iii) If a reservoir has a capacity of more than 1,000 acre <br />u <br />banks. Coal <br />• <br />-37- Revised 12/22/86 <br />(ii) Each detailed design plan for structure shall: <br />(8) Describe the operation and maintenance <br />requirements for each structure; <br />