Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />999 <br /> <br />RECE ~ OF COLORADO <br />OFFICE OF THE STATE ENGINEER 3EP 2 3 1998 <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 81 B QIN, OF MINERAL <br />Denver, Colorado 80203 8 GEOLOGY <br />Phone (3031 866-3581 <br />FAX 1303) 8663589 <br />DATE: <br />TO: <br />CC: <br />FROM: <br />RE: <br />OF ep/p <br />tip= <br />Ne ; <br />G• <br />. . <br />re l6 ~ <br />Roy Romer <br />Governor <br />Res onse to Reclamation Permit A lication Consideration lames 5. Lochhead <br />P PP Executive Duector <br />Hal D. Simpson <br />'y ~ . 9 ~ State Engineer <br />Cor 1 a- /'Vlouh ~- ,Senior Environmental Protection Specialist <br />Division ~ Office; District ~ Water Commissioner, Groundwater Commission <br />~e.cll Frees! I`'C L <br />~r a rear Pit, File No. M- ~ ~f - 07 ~ <br />Section Z , Twp ~ Rng x-17 (,~, 6th P.M., Yy-t^'t ~ <br />Operator: /2, ~ (nav ~ rr~.l recz/ <br />Contact Name: <br />Address:/O $o $~ C <br />Phone: ~`I70~ ~7~ ~~- <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site <br />and document the locations of all wells within 600 feet (1/2 mile if in Designated Basins) of <br />the permit area. The applicant must then obtain a waiver of objection from all well owners <br />with wells within 600 feet (1/2 mile if in Designated Basins) of the permit area or request a <br />hearing before the State Engineer. <br />^ Other: <br />County <br />COMMENTS: <br />