Laserfiche WebLink
C~ <br /> <br />-6- <br />Location in Application <br />INFORMATION CATEGORY _ NARRATIVE MAPS <br />2.05.3(4) Ponds, Impoundments and Appendix A Plates 17, 21-33 <br />Diversions <br />2.05.3(5) Topsoil (removal and Section F Plates 12, 15 <br />storage) <br />2.05.3(6) Overburden Sections C & D Table 3 <br />2.05.3(7) Coal Handling Structures Section D t E Plate 19 <br />2.05.3(8) Coal Processing Waste and Section C <br />Non-Coal Processing Waste <br />2.05.3(9) Underground Development Section D <br />Waste <br />2.05.3(10) Return of Coal Processing <br />Waste to Abandoned Section C <br />Workings <br />2.05.4 Reclamation Plan Section F Plate 11, Table <br />2.05.4(2)(a) Timetables See Section <br /> 2.03.8 Plate lI <br />2.05.4(2)(b) Reclamation Cost Estimates) Tables 4-b t <br /> Technical Revisio #3 <br />2.05.4(2)(c) Backfilling and Grading *Post-mining <br /> Section F topography - Plate <br /> 2.05.4(2)(c) <br />2.05.4(2)(d) Topsoil (Redistribution) Section F Plates 12 ~ 15 <br />2.05.4(2)(e) Revegetation <br /> .Section F <br />2.05.4(2)(f) Disposal of Debris, Acid- Section F <br />Forming and Toxic-Forming <br />Materials <br />4-b <br />hru 4-d <br />20 <br /> <br />