Laserfiche WebLink
I!! IIIIIIIIIIIIIIII <br />sss <br />~- <br />te <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER oc~co~ <br />Division of Water Resources ,,~~ b <br />Depanmen[of Natural Resources RECEIVED ~„ . o <br />1313 Sherman Street. Room 818 ~1~~" <br />Denver, Colorado 80203 MAY 19 1995 •~~°: <br />rBi6 <br />Phone 1303) 8G6-3581 <br />FAx (3031 866-3569 <br />RESPONSE TO RECLAMA~{flisi te1r1@IH~PA~i€&Geology ~~YR~o~" <br />APPLICATION CONSIDERATION lan,r<s L~rhhrad <br />t+rcub.r .rlmm~i <br />Ha! D. Simp.nn <br />TO: Carl B. Mount, Senior Environmental Protection Specialist s~a~c EnF.ncrr <br />DMG#: /1/I- 9 S-C~O~ // SIT/E2NAME: ~GrSTr? '/~it <br />OPERATOR: ~ Cil~r ~C1/1/Ar~ L;'ra„P~~g000NTY: I~ r~ Ct rJavi <br />LANDOWNER: <br />LOCATION: SEC: _~ TWP: ~_RNG:lc~ PM: ~~ WD: 4 9 DIV: _L <br />CONDITIONS/STIPULATIONS FOR APPROVAL <br />The proposed operation does not Prior to approving a gavel well <br />anticipate exposing Bound water. Therefore, no permit, the applicant will need a wavier of <br />exposure of Bound water can occur during and objection from well owners within 600 feet <br />after mining operations. or request a hearing before the Siate <br />Engineer. <br />The proposed operation will consume <br />ground water by _ evaporation, _ dust <br />control, _ reclamation, _ and water <br />removed in the mined product. Prior to initiation <br />of these uses of Bound water, the applicant will <br />need to obtain a gavel well permit. Ptior to <br />obtaining a permit, an approved water supply <br />nlan nr a decreed elan for auementation will be <br />The proposed operation tray have <br />potential impact on existing water rights <br />nearthe projectlocation. Please provide <br />evidence that the proposed project will not <br />alter or impact the historic operation of the <br />existing water rights. <br />cc: Division ~ Office; M 00 File; Water Commissioner for WD~ <br />