Laserfiche WebLink
Sheet 2 of 2 'v ~' <br />HOU@LY PRODUCTION: <br />Scraper Cycle Time <br />Load = , D`9, min. <br />Maneuver L spread = D,6 min. <br />Travel time (haul A return): <br />Haul route <br />Joh Condition Correction Factors <br />Site altitude - "",,..T200 ft. <br />Alt. adjuatmemt .. 1 <br />Joh efficiency .,. 0,83 (Iahld( <br />Net Correction 0,83 <br />Road Length Crade Bolling Total Velocity Travel time= <br />seg. t (ft( res.(XI res.(XI res,(XI (fpm( (min( <br />1 250 -20.00 5.00 -15,00 11 T9 0.33 <br />seal tine _ 0.33 min. <br />Return route """"""" <br />1 250 20,00 S.DD 2s.oo sea o.51 <br />• <br /> <br />tlst A last aeg, adj. for accel./decel. @eturn time = 0.51 aim. <br />Total Cycle Tiae o 2.34 ain, ; <br />"""' Machine Yoluae <br />tlachine Payload """"""" <br />"""""""" ; Struck capacity = <br />Material Weight = 1600.00 the/LCY @eaped capacity = <br />Hat. description : """' <br />Top Soil Average = <br />@ated payload 48,000 Ihs. ' ; Adjusted voluae <br />...,... , <br />Payload voluae 30.00 LCY <br />Unadjusted production pet scraper or push-pull pair <br />Adjusted productioa <br />Adjusted hourly fleet production <br />JOB COST: <br />Fleet size 2 Scraper(s) <br />Ur.it Cost :..40.354 /GCY <br />14.00 <br />20.00 <br />----- - - <br />11.00 LCY <br />17.00 LCP <br />873.25 LCY/hr <br />724.80 LCY/hr <br />124.80 LCY/hr <br />Total Joh Time: 31.10 @ours <br />Total Joh Cost: ..58,139 <br />n <br />S~ <br />