Laserfiche WebLink
ESTIMATING FORN - BULLD02ER WOAk _ iou~ 6<p,L <br />~~°i <br />•~ ~ ~~ <br />N `~~ <br />~~ <br />Task tl:"__.__1.____ Prep, by:""`HBR <br />Date: 06/14/91 Permit tl:C;81~039 <br />Permit Action: POND 4 <br />Task Description: BACKFILL/REMOVE POND <br />Task File Name: C039M1IiNKB <br />Nine: Grassy bap <br /> HOURLY EQUIPMENT COST <br /> ____________________" Basic Machine: Cat D9N Horsepower: 370 <br /> Blade Type: Universal """'""" <br />• Attachment tll: ROPS Cab Shift Basis: 1/day <br /> Attachment tl2: 3-shank ripper """"`" <br /> Cost Breakdown: <br />• ""`'"`""`"' Utilization i (code hkm) <br /> Ownership cost/hr = 547.31 N/A <br /> Operating 6 overhaul cost/hr- dozer = 559.68 100 <br />• -ripper = 51.35 20 <br /> Operator cost/hr : 521.06 NJA <br />• Total egpt. unit cost/hr ~ 5129.47 Total fleet cost/hr: (258.93 <br />• MATERIAL QUANTITIES <br /> Initial Swell Lcose <br />~ Volume: 65,000.0 BCY Factor: 1.180 Volume: 76,100.0 LCY <br /> <br /> Source of quantity takeoff: USER <br />• <br /> Source of est. swell factor: ESER <br />• <br /> HOURLY PRODUCTION <br /> """`"""`"`""" Job Condition Correction Factors <br />• Avg. push distance: 200 ft. --___"______."__."__._ "_.__".__, <br /> """""" Operator..........: 0.15 (avg.) <br /> Unadjusted hourly Nat, consistency..: I.00 (Cat tbl) <br />• dozer production: 101 LCYJhr Dozing method.....: 1.00 {gen.) <br /> "`""`"` Visibility........: 1.00 (avg.) <br /> Naterial consistency: Job efficiency.... 0.83 (lsh/day) <br />. Consolidated stockpile Transmission type.: 1.00 ( PS ) <br /> Grade adjustment..: 1.41 (Cat tbl <br /> Avg, pusA gradient: 20.00 t (neg} Altitude adj.....: 1.00 (Cat tbl} <br />0 `""'""' Naterial weight...: ].00 (Cat tbl) <br /> Avg, site altitude: 7000 ft. Blade type........ 1.00 (S or U) <br />~ Naterial weight 2300.00 lb/LCY Met Job Correction : 0.92 <br /> Mat. Descr.: "_____"_" __ ______"__"" <br /> GENERAL FILL Adjusted Unit Prod.: 641.85 LCY/hr <br />• <br /> Adjusted Fleat Production: <br />__ 1283.11 <br />___________ LCY/hr <br /> J08 COST <br />• Fleet size : 2 Dozers) Total Job Timm: " " 59 15 Hours <br /> ~ <br /> Unit Cost : f0.202 /LCY Total Job Cost: (15,470.13 t1 r 2 b o <br />~ .i Rory <br />