Laserfiche WebLink
• LIST OF FIGURES <br />Figure No. Page <br />13-1 Recamation Timetable 13-29 <br />13-2 Typical Section of Temporary Pit Reclamation 13-35 <br />13-3 Typical Plan View of Temporary Pit Reclamation 13-38 <br />LIST OF ATTACHMENTS <br />Attachment No. <br />13-1 Bond Calculation worksheets <br /> LIST OF APPENDICES <br />Aooendix Ng. <br />13-1 1980 Revegetation Success Evaluation Report <br />13-2 Permit Stipulation Responses <br />13-3 1985 Revegetation Monitoring Report <br />• 13-4 Alfalfa Management and Control Plan <br />13-5 Noxious Weed Control Plan <br />13-8 Revegetation Plan -Pond 008/East Wadge EMension Area <br />13-7 Revegetation Plan -North Wadge Deadhead Route <br />13-8 Rodc Chedcdam Design <br />13-9 Stock Tank Design <br />13-9A Stock Pond Stability Analysis <br />13-10 Shrub Establishment Studies <br />13-11 CSU/DMG Permanent Shrub Plots <br />13-12 Postmine Permanent Features <br />13-12a Landowner Requests for Permanent Features <br />13-13 Vegetation Evaluation Procedures for Testing Reclamation Adequacy for Phase III Bond <br /> Release <br />13-14 Weed Management Plan <br />13-15 Historical Approaches to Testing for Successful Reclamation <br />J <br />TR~0 1 &iii Revised 02106 <br />