Laserfiche WebLink
• FINAL.WK1 Exhibit 12 <br />FINAL CONTOURS <br />CHANGE IN ORIGINAL SURFACE ELEVATION <br />The following tables show the estimated change in the final <br />surface elevation of the mining area. The calculations <br />are based on an overburden bulking factor of 1.3. The final <br />thickness is the product of the overburden thickness times 1.3. <br />The overburden thickness is the original thickness minus the coal <br />thickness. The tables vary with coal thickness. <br />This table is the basis for the preparation of the final <br />contour map. <br /> STRIPPING COAL ORIGINAL FINAL CHANGE IN <br /> RATIO THICKNESS THICKNESS THICKNESS SURFACE EL <br /> 1:1 3.0 6.0 3.9 -2.1 <br /> 'L:1 3.0 9.0 7.8 -1.2 <br /> 3:1 3.0 12.0 11.7 -0.3 <br /> 4:1 3.0 15.0 15.6 0.6 <br /> 5:1 3.0 18.0 19.5 1.5 <br /> 6:1 3.0 21.0 23.4 2.4 <br /> 7;1 3.0 24.0 27.3 3.3 <br /> 8;1 3.0 27.0 31.'L 4.2 <br />• <br /> STRIPPING COAL ORIGINAL FINAL CHANGE IN <br /> RATIO THICKNESS THICKNESS THICKNESS SURFACE EL <br /> I:1 4.0 8.0 5.'L -2.8 <br /> 2:1 4.0 12.0 10.4 -1.6 <br /> 3:1 4.0 16.0 15.6 -0.4 <br /> 4;1 4.0 20.0 20.8 0.8 <br /> 5:1 4.0 24.0 26.0 'L .0 <br /> 6;1 4.0 28.0 31.2 3.2 <br /> 7:1 4.0 32.0 36.4 4.4 <br /> 8:1 4.0 36.0 41.6 5.6 <br /> STRIPPING COAL ORIGINAL FINAL CHANGE IN <br /> RATIO THICKNESS THICI{NESS THICKNESS SURFACE EL <br /> 1:1 5.0 10.0 6.5 -3.5 <br /> 2:1 5.0 15.0 13.0 -2.0 <br /> 3:1 5.0 20.0 19.5 -0.5 <br /> 4:1 5.0 25.0 26.0 1.0 <br /> 5:1 5.0 30.0 32.5 2.5 <br /> 6:1 5.0 35.0 39.0 4.0 <br /> 7:1 5.0 40.0 45.5 5.5 <br /> 8:1 5.0 45.0 52.0 7.0 <br />. <br />1'l-1 <br />