My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111914
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:22 PM
Creation date
11/24/2007 9:00:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998058
IBM Index Class Name
Permit File
Doc Date
7/23/1995
Doc Name
GRAVEL OPERATIONS ON THE TELLIER PROPERTY AND THE P&M PROPERTY
From
DOW
To
ROUTT CNTY BOARD OF COMMISSIONERS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparimenl ui Natural Resources <br />151 1 Sherman 51., Room '_ I i <br />Denrrr, Culurarlu AO?03 <br />Phone. 13031 866-156% <br />F:\% (30 4) A 52-8106 <br />October 14, 1993 <br />Routt County County Soil Conservation District <br />147 Pine Grove Road,#201A <br />Steamboat Springs, Colorado 80437 <br />RE: Johnson Excavation, Inc., Perrnit No. M-98-058 <br />Tellier Gravel Pi[ 1 IZ Permit Application <br />Dear Routt County Board of Commissioners, <br />~~~~~ <br />DEPARTIv1ENT OF <br />NATURAL <br />RESOURCES <br />Rny Romer <br />Governor <br />dames S Lochhead <br />ExeNlive DueUOr <br />ht~chael B. Lang <br />Division Director <br />The Division of Minerals and Geology received public comments objecting to the approval of the 112 permit <br />application for the proposed Tellier Gravel Pit, Permit No. M-98-058. Under [he Construction Material Rules and <br />Regulations, three public meetings will be held, and are as follows; <br />Informal Conference (Rule 1.4.6) The purpose of [he informal conference is to identify all parties to the proceedings <br />and formal Board Hearings, determine what issues have been resolved (if any), and if there are additional issues, <br />identify the issues that the Board, by statute, havejurisdiction to address, and explain the hearing process. The meeting <br />will be held at the Routt County Courthouse in Steamboat Springs on October 20,1998 at 8:30 a.m. <br />Pre-hearing Conference (Rule 2.7) The Pre-Hearing Conference will be presided over by the Pre-Hearing <br />Conference Officer. The Pre-hearing Conference Officer is appointed by the Mined Land Reclamation Board. The <br />purpose of the Pre-Hearing Conference is to draft a hearing order that lists issues the full Board should consider, lists <br />the witnesses and evidence to be presented by parties, lists the parties that will participate, determine the amount of <br />time afforded each party, and to resolve any other issues that the Pre-hearing Conference Officer determines is <br />appropriate. The Pre-Hearing Conference will be scheduled between November 6 and November 10, 1998. <br />Formal Board Hearing (Rule 2.8) The Board will conduct the Tellier Gravel Pit hearing according to the provisions <br />of the adopted hearing order, [he Administrative Procedures Act, Section 24-4-105, Colorado Revised Statutes <br />(C.R.S.), and the Colorado Code of Regulations, 2 CCR 407-4, Section 2.8. The Formal Public Hearing will be held <br />during the November 18-19, 1998 Board meeting. The hearing will be held in Room 318 of 1313 Sherman Street, <br />Denver, Colorado, beginning at 9:00 a.m. or as soon thereafter as the matter can be considered. <br />If you have any questions regarding these three meetings, please do not hesitate to call. <br />Sin~ely, <br />Erica Crosby ~~~~ / <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.