Laserfiche WebLink
<br />"EXHIBIT D" - (con't) <br />RECLAMATION PLAN <br />Using this plan will make the reclaimed land of subject site <br />superior to that of neighboring lands. <br />Execution of this reclamation plan is estimated to be <br />$3,500.00. Most of the cost will be in the grading and preparation <br />for re-vegetation. Materials necessary for accomplishment are on <br />site and little dry surface area will be affected. Operator will <br />keep the banks of the bond at not steeper than a 3:1 ratio during <br />mining operations. This will minimize need for much work on banks <br />of pond at time of reclamation. <br />This Reclamation Plan will be completed 120 days after <br />termination of mining operations at the Thomeczek Pit. <br /> <br />I. (Jew L..v~ dW W ~ ~,` Q/l~ <br />ti. Ot~. f,-k-o ~r ale ~.~,e,,, sw . ~ . z.~ h <br />3. ~~ ., ~ ~ SE. o.q$ <br />~r. p~ ~. ~, r~,.e.~e~v- (~ x w) <br />C~= SSo~ srp'~ 43e'+430' <br />~'a ~ ~ = `~' 6 3 ati <br />-2- <br />