My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111899
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111899
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:21 PM
Creation date
11/24/2007 8:59:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004047
IBM Index Class Name
Permit File
Doc Date
2/11/2005
Doc Name
Response to Adequacy Review Comments
From
WSI Weiland Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~,. <br />General Guidelines for Design and Construction Activities On or Near <br />Karr- McGee Gathering LLC and Kerr -McGee Rocky Mountain Corporation <br />Pipelines and Related Facilities <br />its facilities. The organization responsible for blasting shall be liable for any and all damages caused to KMG's facili8es as <br />a result of their activdies whether or not KMG representatives are present. KMG shall have a signed and executed Blasting <br />Indemnification Agreement before authorized permission la blast can be given. <br />No blasting shall be allowetl within 200 feet of KMG's facilities unless blasting notification is given to KMG a minimum of <br />one week before blasting. The organzation responsible for blasting must wmDlele Blasting Plan Data. KMG shall review <br />and analyze the blasting methods. A wnden blasting plan shall be provided by the organization responsible for blasting <br />antl agreed to in writing by KMG. A written emergency plan shall he pmvitled by the organization responsible for blasting. <br />KMG shall have a signed and executed Blasting Indemnification Agreement before authorized permission to blast can be <br />given. A pre-blast meeting shell be conducted by the organization responsible for blasting. <br />• Any contact with any KMG facility, pipeline, valve set, etc. shall be reponed immediately to KMG. If repairs to the pipe are <br />necessary, they will be made and inspected before the section is re-waled and the line is back-filled. <br />KMG personnel shall install all test leads on KMG facilities <br />Local Kerr-McGee Gathering LLC Representation: <br />Manager of Construction 8 Facilities Engineering: Kevin R. Osif, P.E. Phone: 303 655 - 4307 <br />Facilities Engineer: Joseph E. Sanchez, P.E. Phone: 303 655 - 4319 <br />Foreman t: James Phillips Phone: 303 655 - 4343 <br />Foreman-1: ~ Rick Nogsinger Phone: 303-655 - 4326 <br />Emergency Contacts: <br />On call supervisor Phone: 303-559 - 4001 <br />Kerr McGee 24 hour emergency number Phone: 303-659 - 5922 <br />One Call Emergency ~ Phone: 800.922 -1987 <br />Page 3 of 3 Revision 3/01/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.