2.0 HAUL ROAD <br />4.0 CONSTRUCTION OF MINE BENCH FILL <br />4.1 GENERAL <br />4.1.1 FILL SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NOTES AND DETAILS SPECIFIED ON <br />THE DRAWINGS. <br />5.3 'HAUL ROAD <br />5.3.1 THE HAUL ROAD SHALL BE INSPECTED DURING CONSTRUCTION AND CERTIFIED AFTER CON- <br />STRUCTION BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />2.1 GENERAL <br />4.2 SITE INSPECTION AND PREPARATION <br />2.1.1 A HAUL ROAD FOR ACCESS TO THE MINE BENCH AND APPURTENANT STRUCTURES SHALT. BE CON- <br />STRUCTED AT THE LOCATION SHOWN AND ACCORDING TO THE NOTES AND DETAILS SPECIFIED 4.2.1 ALL ROOTS, STUMPS, VEGETATION, OR OTHER ORGANIC MATERIALS WHICH REMAIN AFTER RE- <br />MOVAL OF TOPSOIL AND WHICH COULD CONTRIBUTE TO SPONTANEOUS COMBUSTION OR INTER- <br />FERE WITH THE SYSTEMATIC CONSTRUCTION OF THE FILL SHALL BE REMOVED PRIOR TO <br />2.1.2 THE CONSTRUCTION, MAINTENANCE, AND POST- MINING CONDITION OF THE ACCESS ROAD SHALL PLACEMENT OF ANY FILL. <br />INCLUDE ADEQUATE CONTROL of EROSION, SILTATION, AND POLLUTION OF WATER. 4.2.2 ANY SOFT OR WEAK SOILS WHICH ARE LOCATED IN CRITICAL AREAS OF THE FOUNDATION AND <br />WHICH COULD, IN THE OPINION OF THE INSPECTING ENGINEER, INFLUENCE THE STABILITY <br />2.2 SITE PREPARATION OF THE FILL, SHALL BE REMOVED PRIOR TO PLACEMENT OF ANY FILL. <br />2.2.1 ALL VEGETATION, ROOTS, AND STUMPS SHALL. BE REMOVED. TOPSOIL SHALL BE REMOVED 4.2.3 ROATCAP CREEK SHALL BE DIVERTED AROUND ANY FILL MATERIAL PRIOR TO CONSTRUCTION OF ' • IVIED <br />FROM THE DESIGN ROADBED AND ASSOCIATED CUTS AND FILES, AND STOCKPILED IN ACCOR- THE 48 -INCH CSP CULVERT FOR DIVERSION THROUGH THE FILL. NO FLOW OR SEEPAGE FROM �r <br />DANCE WITH SECTION 1.0, TOPSOIL, OF THESE SPECIFICATIONS. TOPSOIL. STORAGE SHALL THE TEMPORARY DIVERSION SHALL BE ALLOWED TO ENTER THE FILL OR FOUNDATION BELOW 10 jl*:! <br />BE AT THE LOCATION INDICATED ON THE DRAWINGS. THE CONSTRUCTED FILL. Wft <br />4.2.4 DRAINAGE OF THE CLEARED FOUNDATION SHALL ENSURE THAT STANDING WATER DOES NOT REAM ow1apq <br />2.3 CONSTRUCTION ACCUMULATE AT ANY LOCATION ON THE FOUNDATION. <br />2.3.1 ROAD FILLS SHALL BE CONSTRUCTED IN HORIZONTAL LAYERS. EACH LAYER OF FILL SHALL 4.2.5 SURFACE WATER FROM WITHIN THE FOUNDATION AREA SHALL BE DIRECTED TO THE OUTSIDE OF <br />BE LEVELED AND COMPACTED EVENLY BY ROUTING HAULING AND LEVELING EQUIPMENT OVER THE FILL AND DRAINED AWAY FROM THE FILL AND ITS FOUNDATION AT ALL TIMES DURING <br />THE ENTIRE WIDTH OF THE EMBANKMENT UNTIL NO SIGNIFICANT MOVEMENT OF THE EMBANK- CONSTRUCTION OF THE FILL. <br />MENT MATERIAL IS APPARENT. 4.2.6 THE SLOPE OF THE FOUNDATION IN THE VICINITY OF THE TOE OF ANY FILL OR EMBANKMENT <br />2.3.2 RETAINING STRUCTURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH DESIGN SPF.CIFICA_ SHALL NOT EXCEED 1(V):2.8(H) (36 PERCENT). <br />TIONS. 4.2.7 SOILS EXPOSED IN THE FOUNDATION EXCAVATION SHALL BE COMPACTED PRIOR TO PLACEMENT <br />2.3.3 THE HAUL ROAD SHALL BE SURFACED WITH A MATERIAL SUFFICIENTLY DURABLE FOR THE OF FILL. <br />ANTICIPATED VOLUME, WEIGHT, AND SPEED OF ANTICIPATED TRAFFIC AND WHICH Is NOT q,2,g ANY FOUNDATION MODIFICATIONS DETERMINED TO BE NECESSARY AS A RESULT OF THE SITE <br />ACID- OR TOXIC-FORMING. INVESTIGATION AND FOUNDATION STABILITY ANALYSES SHALL BE COMPLETED PRIOR TO THE <br />PLACEMENT OF ANY =ILL ON THE AREA OF THE FOUNDATION REQUIRING MODIFICATION. tMEFMA <br />2.4 MAINTENANCE•••isYE'9. X60 <br />q ?1lps�'�P y� <br />2.4.1 THE HAUL ROAD SHALL BE MAINTAINED SUCH THAT THE DESIGN STANDARDS ARE MET THROUGH- 4.3 CONSTRUCTION • /v�'- �- <br />sn 15888 <br />OUT ITS LIFE. <br />4.3.1 SHALL APPROXIMATELY <br />IN <br />THICKNESS AND COMPACTED BY ROUTING HORIZONTAL LAYERS O INCHES <br />NGCONSTRUCTIONEQUIPMEENTUNIFORMLY OVER 39j:;�oNAt- <br />SURFACE OF THE PILE. .... •OQpop <br />,, F coo COLORADO WESTMORELAND INC. <br />4.3.2 COMPACTED FILL SHALL HAVE A DRY DENSITY OF AT LEAST 90 PERCENT OF THE MAXIMUM DRY P.O. BOX 1299 <br />DENSITY AS DETERMINED BY THE AASHTO SPECIFICATION T99 -74 ( "STANDARD PROCTOR ") OR PAONIA, COLORADO 81428 <br />AS DIRECTED IN CONSTRUCTION DRAWINGS. FINE WASTE MATERIAL IN EXCESS OF THE PER- DATE CHECKED REVISION <br />CENTAGES ASSUMED IN DEVELOPING SHEAR STRENGTH PARAMETERS FOR THE WASTE MATERIAL ORCN4AP VAL.CEV �ESj PoRfALS DES1GruS <br />SHALL NOT BE INCORPORATED INTO THE OUTER 50 FEET OF THE PILE OUTSLOPE. _ 0/9/ MSN CH. TOPSOIL,HAUL ROAD,FILL _SkEET NO. 10 /OF /O <br />4.3.3 SURFACE DRAINAGE OF THE FILL SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION BY GRAD- *SPEC I F I CATIONS <br />ING THE SURFACE TO A MINIMUM SLOPE OF 2 PERCENT AND INSURING THAT NO SURFACE <br />DEPRESSIONS EXIST. <br />004437 <br />1.0 TOPSOIL <br />3.0 SEDIMENTATION POND <br />3.1 <br />GENERAL <br />1.1 <br />GENERAL <br />3.1.1 <br />THE SEDIMENTATION POND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE DRAWINGS. <br />4.3.4 <br />No FILL SHALL BE PLACED ON STANDING WATER, SNOW, OR ICE, NOR SHALL ANY SNOW OR <br />1.1.1 <br />ALL TOPSOIL SHALL BE REMOVED AND SEGREGATED FROM OTHER MATERIAL AFTER VEGETATION <br />ICE BE INCORPORATED IN THE FILL. <br />COVER IS CLEARED BUT BEFORE ANY EXCAVATION OR OTHER SURFACE DISTURBANCE. <br />3.2 <br />SITE PREPARATION <br />4.3.5 <br />THE CSP CULVERT AND APPURTENANT STRUCTURES FOR DIVERSION OF ROATCAP CREEK THROUGH <br />1.1.2 <br />VEGETATION COVER SHALL BE REMOVED ONLY FROM THOSE AREAS FROM WHICH IT IS NECES- <br />THE FILL SHALL BE CONSTRUCTED AT THE LOCATION AND GRADES DETERMINED BY THE CUL- <br />SARY TO REMOVE TOPSOIL. THE AREA OF DISTURBANCE SHOULD BE MINIMIZED TO THE <br />3.2.1 <br />ALL VEGETATION, ROOTS, AND STUMPS SHALL BE REMOVED. TOPSOIL SHALL BE REMOVED <br />VERT DESIGNER. BEDDING PREPARATION AND COMPACTION OF FILL AROUND THE CULVERT <br />EXTENT POSSIBLE. <br />FROM THE POND AREA AND STOCKPILED IN ACCORDANCE WITH SECTION 1.0, TOPSOIL, OF <br />SHALL BE COMPLETED IN ACCORDANCE WITH THE CULVERT DESIGNER'S SPECIFICATIONS. <br />THESE SPECIFICATIONS. TOPSOIL STORAGE SHALL BE AT THE LOCATION INDICATED ON THE <br />1.1.3 <br />TOPSOIL SHALL BE REMOVED FROM THE AREAS OF THE PROPOSED SEDIMENTATION POND, HAUL <br />DRAWINGS. <br />4.3.6 <br />THE FILL OUTSLOPE SHALL BE HYDROSEEDED TO PROMOTE REVEGETATION AND EROSION <br />ROAD, AND THE MINE BENCH CUT AND FILL ON THE WEST SIDE OF EAST ROATCAP CREEK. <br />CONTROL. <br />3.2.2 <br />ANY SOFT OR WEAK SOILS WHICH ARE LOCATED IN CRITICAL AREAS OF THE PONDS AND WHICH <br />1.1.4 <br />A TOTAL THICKNESS OF 32 INCHES OF TOPSOIL SHALL BE REMOVED ON THE WEST SIDE OF <br />COULD, IN THE OPINION OF THE INSPECTING ENGINEER, INFLUENCE THE STABILITY OF THE <br />4.3.7 <br />THE THICKNESS OF A TOPOSOIL LAYER PLACED ON OUTSLOPES OF FILL SHALL NOT EXCEED 4 <br />EAST ROATCAP CREEK. NO TOPSOIL. WILL BE REMOVED ON THE EAST SIDE OF EAST ROATCAP <br />PONDS, SHALL BE REMOVED PRIOR TO CONSTRUCTION. <br />FEET. <br />CREEK. <br />3.3 <br />CONSTRUCTION <br />4.4 <br />INSPECTIONS <br />1.2 <br />REMOVAL <br />3.3.1 <br />THE EMBANKMENT SHALL BE CONSTRUCTED FROM FINE - GRAINED, ON -SITE COLLUVIAL SOILS. <br />4.4.1 <br />THE FILL SHALL BE INSPECTED DURING CONSTRUCTION IN ACCORDANCE WITH SECTION 5.0, <br />1.2.1 <br />TOPSOIL SMALL BE EXCAVATED AND REMOVED IN A MANNER WHICH WILL MINIMIZE CONTAMI- <br />NO ROCKS LARGER THAN 6 INCHES MAXIMUM DIMENSION SHOULD BE INCORPORATED INTO THE <br />INSPECTIONS, OF THESE SPECIFICATIONS. <br />NATION WITH OTHER SOIL HORIZONS OR WITH BEDROCK. <br />FILL. NO ROOTS, STUMPS, ORGANIC, OR OTHERWISE DELETERIOUS MATERIALS SHALL BE <br />INCORPORATED INTO THE FILLS. <br />1.2.2 <br />SUCH MEASURES AS ARE NECESSARY WILL BE TAKEN TO INSURE THAT REMOVAL OF TOPSOIL <br />DOES DOES NOT RESULT IN EROSION OR WATER POLLUTION. <br />3.3.2 <br />FILL SHALL BE PLACED IN HORIZONTAL LAYERS NOT EXCEEDING 12 INCHES IN LOOSE <br />THICKNESS AND COMPACTED BY ROUTING CONSTRUCTION EQUIPMENT UNIFORMLY OVER THE <br />SURFACE OF THE FILL. <br />1.3 <br />STORAGE <br />3.3.3 <br />THE COMPACTED EMBANKMENT SHALL HAVE A DRY DENSITY OF AT LEAST 95 PERCENT OF THE <br />1 .3.1 <br />SALVAGED TOPSOIL WILL BE PLACED IN LAYERS NOT EXCEEDING 4 FEET ON OUTSLOPES oe <br />MAXIMUM DRY DENSITY AS DETERMINED BY THE AMERICAN ASSOCIATION OF STATE HIGHWAYS <br />THE MINE. BENCH FILL. REMAINING TOPSOIL WILL BE PLACED IN A LIVE TOPSOIL STORAGE <br />AND TRANSPORTATION OFFICIALS (AASHTO) SPECIFICATION T99 -74 ( "STANDARD PROCTOR "). <br />AREA ADJOINING THE MINE SITE. <br />3.3.4 <br />FILL PLACED AROUND PIPES, CULVERTS, OR OTHER STRUCTURES INCLUDED WITHIN THE <br />5.0 INSPECTION <br />1.3.2 <br />STOCKPILED TOPSOIL SHALL BE PROTECTED BY AN EFFECTIVE COVER OF NON- NOXIOUS, <br />EMBANKMENT SHALL MEET THE SAME PLACEMENT AND COMPACTION CRITERIA AS ALL OTHER <br />QUICK - GROWING, ANNUAL AND PERENNIAL PLANTS SEEDED OR PLANTED DURING THE FIRST <br />FILL. <br />APPROPRIATE GROWING SEASON AFTER REMOVAL FOR FAVORABLE PLANTING CONDITIONS. <br />5.1 <br />SEDIMENTATION PONDS <br />3.3.5 <br />THE DISTRIBUTION OF MATERIALS IN THE EMBANKMENT SHALL BE SUCH THAT THERE ARE NO <br />1.3.3 <br />STOCKPILED TOPSOIL AND OTHER MATERIALS SHALL NOT BE MOVED UNTIL REQUIRED FOR <br />LENSES, POCKETS, OR STREAKS OF MATERIAL DIFFERING SUBSTANTIALLY FROM THE SUR- <br />5.1.1 <br />THE SEDIMENTATION PONDS SHALL BE INSPECTED DURING CONSTRUCTION AND CERTIFIED <br />REDISTRIBUTION ON A REGRADED AREA. <br />ROUNDING FILL. <br />AFTER CONSTRUCTION BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />1.3.4 <br />THE STORED TOPSOIL SHALL BE CLEARLY MARKED BY A SIGN "TOPSOIL STORAGE ". <br />3.3.6 <br />FILL SHALL NOT BE PLACED ON FROZEN SURFACES, NOR SHALL SNOW, ICE, OR FROZEN <br />5.1.2 <br />CERTIFICATION OF THE CONSTRUCTED PONDS SHALL BE FORWARDED TO THE COLORADO MINED <br />MATERIAL BE INCORPORATED INTO THE FILL. <br />LAND RECLAMATION DIVISION FOLLOWING CONSTRUCTION. <br />1.4 <br />REDISTRIBUTION <br />3.4 <br />MAINTENANCE <br />5.2 <br />MINE BENCH FILL <br />1.4.1 <br />AFTER FINAL GRADING AND BEFORE REPLACEMENT OF TOPSOIL AND OTHER MATERIALS, <br />REGRADED LAND SHALL BE LOOSENED BY MECHANICAL MEANS TO A SUFFICIENT DEPTH TO <br />3.4.1 <br />THE SEDIMENTATION POND SHALL BE ROUTINELY MAINTAINED DURING MINING OPERATIONS. <br />5.2.1 <br />FILL CONSTRUCTION SHALL BE INSPECTED THROUGHOUT THE CONSTRUCTION BY AN EXPERI- <br />ELIMINATE SLIP SURFACES, RELIEVE COMPACTION, AND PROVIDE FOR ROOT PENETRATION. <br />VEGETATION GROWTH SHALL BE CUT WHERE NECESSARY TO FACILITATE INSPECTIONS AND <br />ENCED GEOTECHNICAL ENGINEER OR OTHER SUITABLY QUALIFIED PERSON WORKING UNDER THE <br />REPAIRS. DITCHES AND SPILLWAYS SHALL BE MAINTAINED IN A CLEAN CONDITION. <br />SUPERVISION OF A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />1.4.2 <br />TOPSOIL AND OTHER MATERIALS SHALL BE REDISTRIBUTED IN A MANNER THAT: <br />5.2.2 <br />INSPECTIONS SHALL INCLUDE MONITORING OF <br />(A) ACHIEVES AN APPROXIMATE UNIFORM, STABLE THICKNESS CONSISTENT WITH POST- <br />3.5 <br />INSPECTIONS <br />MINING LAND USES, CONTOURS, THE SURFACE WATER DRAINAGE SYSTEM, AND RE- <br />(A) REMOVAL OF ALL ORGANIC MATERIAL AND TOPSOIL; <br />QUIREMENTS OF REVEGETATION: <br />3.5.1 <br />ALL EMBANKMENT FILLS SHALL BE INSPECTED DURING CONSTRUCTICN AND OPERATION IN <br />(B) FOUNDATION PREPARATION AND ANY NECESSARY FOUNDATION MODIFICATIONS; <br />ACCORDANCE WITH SECTION 5.0, INSPECTIONS, OF THESE SPECIFICATIONS. <br />(C) PLACEMENT AND COMPACTION OF FILL MATERIALS; AND <br />(B) PREVENTS EXCESS COMPACTION AND CONTAMINATION OF TOPSOIL: <br />(D) REVEGETATION. <br />(C) MINIMIZES DETERIORATION OF THE BIOLOGICAL, CHEMICAL, AND PHYSICAL PROPER- <br />5.2.3 <br />TEMPORARY DIVERSION OF ROATCAP CREEK AND INSTALLATION OF THE 48 -INCH CULVERT <br />TIES OF THE TOPSOIL; AND <br />THROUGH THE FILL SHALL BE INSPECTED BY A REPRESENTATIVE OF THE CULVERT DESIGNER. <br />(D) PROTECTS THE TOPSOIL FROM WIND AND WATER EROSION DURING REDISTRIBUTION AND <br />5.2.4 <br />COMPLETE CONSTRUCTION RECORDS SHALL BE MAINTAINED IN ORDER TO ENABLE CERTIFICA- <br />BEFORE AND AFTER IT IS SEEDED AND PLANTED. <br />TION THAT THE FILL HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE DESIGN. <br />2.0 HAUL ROAD <br />4.0 CONSTRUCTION OF MINE BENCH FILL <br />4.1 GENERAL <br />4.1.1 FILL SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NOTES AND DETAILS SPECIFIED ON <br />THE DRAWINGS. <br />5.3 'HAUL ROAD <br />5.3.1 THE HAUL ROAD SHALL BE INSPECTED DURING CONSTRUCTION AND CERTIFIED AFTER CON- <br />STRUCTION BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />2.1 GENERAL <br />4.2 SITE INSPECTION AND PREPARATION <br />2.1.1 A HAUL ROAD FOR ACCESS TO THE MINE BENCH AND APPURTENANT STRUCTURES SHALT. BE CON- <br />STRUCTED AT THE LOCATION SHOWN AND ACCORDING TO THE NOTES AND DETAILS SPECIFIED 4.2.1 ALL ROOTS, STUMPS, VEGETATION, OR OTHER ORGANIC MATERIALS WHICH REMAIN AFTER RE- <br />MOVAL OF TOPSOIL AND WHICH COULD CONTRIBUTE TO SPONTANEOUS COMBUSTION OR INTER- <br />FERE WITH THE SYSTEMATIC CONSTRUCTION OF THE FILL SHALL BE REMOVED PRIOR TO <br />2.1.2 THE CONSTRUCTION, MAINTENANCE, AND POST- MINING CONDITION OF THE ACCESS ROAD SHALL PLACEMENT OF ANY FILL. <br />INCLUDE ADEQUATE CONTROL of EROSION, SILTATION, AND POLLUTION OF WATER. 4.2.2 ANY SOFT OR WEAK SOILS WHICH ARE LOCATED IN CRITICAL AREAS OF THE FOUNDATION AND <br />WHICH COULD, IN THE OPINION OF THE INSPECTING ENGINEER, INFLUENCE THE STABILITY <br />2.2 SITE PREPARATION OF THE FILL, SHALL BE REMOVED PRIOR TO PLACEMENT OF ANY FILL. <br />2.2.1 ALL VEGETATION, ROOTS, AND STUMPS SHALL. BE REMOVED. TOPSOIL SHALL BE REMOVED 4.2.3 ROATCAP CREEK SHALL BE DIVERTED AROUND ANY FILL MATERIAL PRIOR TO CONSTRUCTION OF ' • IVIED <br />FROM THE DESIGN ROADBED AND ASSOCIATED CUTS AND FILES, AND STOCKPILED IN ACCOR- THE 48 -INCH CSP CULVERT FOR DIVERSION THROUGH THE FILL. NO FLOW OR SEEPAGE FROM �r <br />DANCE WITH SECTION 1.0, TOPSOIL, OF THESE SPECIFICATIONS. TOPSOIL. STORAGE SHALL THE TEMPORARY DIVERSION SHALL BE ALLOWED TO ENTER THE FILL OR FOUNDATION BELOW 10 jl*:! <br />BE AT THE LOCATION INDICATED ON THE DRAWINGS. THE CONSTRUCTED FILL. Wft <br />4.2.4 DRAINAGE OF THE CLEARED FOUNDATION SHALL ENSURE THAT STANDING WATER DOES NOT REAM ow1apq <br />2.3 CONSTRUCTION ACCUMULATE AT ANY LOCATION ON THE FOUNDATION. <br />2.3.1 ROAD FILLS SHALL BE CONSTRUCTED IN HORIZONTAL LAYERS. EACH LAYER OF FILL SHALL 4.2.5 SURFACE WATER FROM WITHIN THE FOUNDATION AREA SHALL BE DIRECTED TO THE OUTSIDE OF <br />BE LEVELED AND COMPACTED EVENLY BY ROUTING HAULING AND LEVELING EQUIPMENT OVER THE FILL AND DRAINED AWAY FROM THE FILL AND ITS FOUNDATION AT ALL TIMES DURING <br />THE ENTIRE WIDTH OF THE EMBANKMENT UNTIL NO SIGNIFICANT MOVEMENT OF THE EMBANK- CONSTRUCTION OF THE FILL. <br />MENT MATERIAL IS APPARENT. 4.2.6 THE SLOPE OF THE FOUNDATION IN THE VICINITY OF THE TOE OF ANY FILL OR EMBANKMENT <br />2.3.2 RETAINING STRUCTURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH DESIGN SPF.CIFICA_ SHALL NOT EXCEED 1(V):2.8(H) (36 PERCENT). <br />TIONS. 4.2.7 SOILS EXPOSED IN THE FOUNDATION EXCAVATION SHALL BE COMPACTED PRIOR TO PLACEMENT <br />2.3.3 THE HAUL ROAD SHALL BE SURFACED WITH A MATERIAL SUFFICIENTLY DURABLE FOR THE OF FILL. <br />ANTICIPATED VOLUME, WEIGHT, AND SPEED OF ANTICIPATED TRAFFIC AND WHICH Is NOT q,2,g ANY FOUNDATION MODIFICATIONS DETERMINED TO BE NECESSARY AS A RESULT OF THE SITE <br />ACID- OR TOXIC-FORMING. INVESTIGATION AND FOUNDATION STABILITY ANALYSES SHALL BE COMPLETED PRIOR TO THE <br />PLACEMENT OF ANY =ILL ON THE AREA OF THE FOUNDATION REQUIRING MODIFICATION. tMEFMA <br />2.4 MAINTENANCE•••isYE'9. X60 <br />q ?1lps�'�P y� <br />2.4.1 THE HAUL ROAD SHALL BE MAINTAINED SUCH THAT THE DESIGN STANDARDS ARE MET THROUGH- 4.3 CONSTRUCTION • /v�'- �- <br />sn 15888 <br />OUT ITS LIFE. <br />4.3.1 SHALL APPROXIMATELY <br />IN <br />THICKNESS AND COMPACTED BY ROUTING HORIZONTAL LAYERS O INCHES <br />NGCONSTRUCTIONEQUIPMEENTUNIFORMLY OVER 39j:;�oNAt- <br />SURFACE OF THE PILE. .... •OQpop <br />,, F coo COLORADO WESTMORELAND INC. <br />4.3.2 COMPACTED FILL SHALL HAVE A DRY DENSITY OF AT LEAST 90 PERCENT OF THE MAXIMUM DRY P.O. BOX 1299 <br />DENSITY AS DETERMINED BY THE AASHTO SPECIFICATION T99 -74 ( "STANDARD PROCTOR ") OR PAONIA, COLORADO 81428 <br />AS DIRECTED IN CONSTRUCTION DRAWINGS. FINE WASTE MATERIAL IN EXCESS OF THE PER- DATE CHECKED REVISION <br />CENTAGES ASSUMED IN DEVELOPING SHEAR STRENGTH PARAMETERS FOR THE WASTE MATERIAL ORCN4AP VAL.CEV �ESj PoRfALS DES1GruS <br />SHALL NOT BE INCORPORATED INTO THE OUTER 50 FEET OF THE PILE OUTSLOPE. _ 0/9/ MSN CH. TOPSOIL,HAUL ROAD,FILL _SkEET NO. 10 /OF /O <br />4.3.3 SURFACE DRAINAGE OF THE FILL SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION BY GRAD- *SPEC I F I CATIONS <br />ING THE SURFACE TO A MINIMUM SLOPE OF 2 PERCENT AND INSURING THAT NO SURFACE <br />DEPRESSIONS EXIST. <br />004437 <br />