Laserfiche WebLink
• <br />• <br />gullied shoul3 be mapped. A copy of this map, along with a <br />brief written discussion of the problem and proposed mitigative <br />measures should be submitted to the Division by June 1 of each <br />year, and immediately following e:cceptionally heavy rains at <br />the site. <br />3. Pittsburg and Midway should commit to notifying the Division <br />prior to implementing stabilization work, and again when the <br />work has been completed. This stabilization work should begin <br />as soon as the reclaimed area is dry enough to be worked in the <br />late spring or early summer. <br />4. Pittsburg and Midway should commit to implementing the Rill and <br />Gully Stabilization Plan within 30 days of identifying <br />excessive or potentially excessive rilled and gullied areas, or <br />as soon as ground conditions permit. <br />REVISED PAGES 4.3-9, 4.3-9a, AND 4.3-10 ARE ENCLOSED AND SHOULD <br />5ATISIFY THE CONCERNS EXPRESSED ABOVE BY THE MLRD. THE PAGES <br />MAY BE SUBSTITUTED DIRECTLY INTO THE PERMIT FOR PAGES 4.3-9 AND <br />4.3-10. <br />.~ <br />