My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111874
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:20 PM
Creation date
11/24/2007 8:57:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
6/15/2006
Section_Exhibit Name
KII 2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SEALING MINE OPENINGS <br />In accordance with the requirements of our mine plan, 211.41 (c) 30 <br />CFR, the portals (mine openings or entrances into the King Coal Mine) <br />will be backfilled and sealed against inflows of surface water and access <br />by animals or people. Coal stockpile residue on the permit azea will be <br />scraped from the surface and used for backfill inside the portals. This <br />will limit the presence of any potential acid-forming or toxic materials in <br />backfllled and re-graded area and minimize potential contamination of <br />topsoil and revegetation. The four portals are each approximately 10 feet <br />wide by 8 feet high. To fill them to a depth of 25 feet will require about <br />296 cubic yards of material plus a small amount to account for <br />sloughing at the inby end. Total portal backfill will require <br />approximately 400 cubic yards of material. After back-filling to a depth <br />of 25 feet from the portal, the mouth of the portals will be caved to <br />completely seal them. The area will then be backfilled, graded and <br />smoothed over to closely approximate the original contour of the hill into <br />which the portals have been opened. <br />Any coal exploration drill holes, vent holes, and groundwater monitoring <br />wells (not transferred to the landowner) in the permit azea will be <br />backfilled, sealed at water bearing zones, and capped with concrete plugs <br />to meet reclamation requirements. <br />• COMPLIANCE WITH THE CLEAN AIR ACT AND CLEAN WATER ACT <br />National King Coal, LLC has obtained permits for air emissions and point <br />source discharges from the Colorado Department of Public Health and <br />Environment, delegated agency for enforcement of the Clean Air act and <br />Clean Water Act. There aze no waters of the United States requiring a <br />permit from the U.S. Army Corps of Engineers. There aze no federally <br />listed or candidate species that require a take permit, habitat <br />conservation plan, or mitigation plan from the U.S. Fish and Wildlife <br />Service. <br />,o~~ „, ~~,,,, , ~„, ,~,,.oo„~~~, „„„~~ mow,,,, ~~~~,~,~,o~~su„„~,.,,,,~„~.,,~,~~~ ~„~~~ a <br />National King Coal, LLC King II Mine <br />Section 2.05.4 <br />Page 13 May, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.