Laserfiche WebLink
', `i ~~ <br />. 1 ~ • ~/ <br />. ~` <br />l <br />PUBLICATION INSTRUCTIONS <br />COMPLETE BLANKS OF THE NOTICE AS DESCRIBED IN THESE INSTRUCTIONS. <br />DATE OF COMMENCEMENT AND DATE OF COMPLETION SHOULD REPRESENT THE DATES WHICH <br />YOU FEEL MOST ACCURATELY DESCRIBE THE LIFE OF THE OPERATION. <br />FOR LIMITED IMPACT (110) OPERATIONS, THE FINAL DATE FOR RECEIVING COMMENTS IS <br />5 DAYS AFTER DATE OF LAST PUBLICATION OR PRIOR TO 48 HOURS BEFORE THE BOARD <br />MEETING, WHICHEVER COMES FIRST. FOR ALL REGULAR (112) OPERATIONS; THE DATE IS <br />CALCULATED BY ADDING 20 DAYS TO THE DATE OF THE FOURTH PUBLICATION. <br />FOR LIMITED IMPACT (110) OPERATIONS, THIS NOTICE MUST BE PUBLISHED TWICE, ONE <br />WEEK APART, THE FINAL DATE OF PUBLICATION BEING NO LATER THAN 48 HOURS PRIOR <br />TO THE DATE FOR BOARD CONSIDERATION OF THE APPLICATION. FOR REGULAR (112) <br />OPERATIONS, THIS NOTICE MUST BE PUBLISHED ONCE A WEEK FOR FOUR CONSECUTIVE <br />WEEKS, THE FINAL DATE OF PUBLICATION BEING AT LEAST TWENTY DAYS PRIOR TO THE <br />DATE FOR BOARD CONSIDERATION. ALL NOTICES MUST BE PUBLISHED IN A NEWSPAPER OF <br />GENERAL CIRCULATION IN THE LOCALITY OF THE PROPOSED MINING OPERATION: SINCE <br />THE DATE FOR CONSIDERATION OF YOUR APPLICATION MAY CHANGE, DO NOT INCLUDE IT <br />IN THIS NOTICE. <br />FOR A COMPLETE DISCUSSION OF THE NOTICE PROCEDURES AND OBJECTIONS, PLEASE <br />REFER TO RULES 2.2 AND 2.3 FOR REGULAR OPERATIONS AND RULES 3.2 AND 3.3 FOR <br />LIMITED IMPACT OPERATIONS. <br />------------------------------------------------------------------------------- <br />PUBLIC NOTICE <br />Southway Construction Co. Inc.; 117 White Pine; Alamosa, CO 81101, (303) <br />584-5105 has filed an application for a Mining and Reclamation permit with the <br />Colorado Mined Land Reclamation Board under provisions of the Colorado Mined <br />Land Reclamation Act. The proposed mine is located at or near Section 19.0, <br />Township 40,0 N, Range 6.0 E, 10th Prime Meridian. <br />The proposed date of commencement i s ~,oeiG ~ , ~9~7 and the <br />proposed date of completion is r_c~o,P:~ / ,/997 . Tie proposed <br />future use of the land is range an ~~``~-``~~~~io-naT-'information and tentative <br />hearing date may be obtained from the Mined Land Reclamation Board, Room 423, <br />1313 Sherman Street, Denver, Colorado 80203 (303) 866-3567, or Rio Grande <br />County Clerk & Recorder; Box 160 6th 8 Cherry; Del Norte, CO 81132 or the <br />above-named applicant. <br />~.:. <br />Written comments must be received by the Mined Land Reclamation Board by <br />5:00 p, m. on ~i9.PG`t 9 19~. <br />onth, Day, Year) <br />