My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111742
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:14 PM
Creation date
11/24/2007 8:51:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
2/27/2003
Section_Exhibit Name
Tab 12 Coal Resource Recovery Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The haul road has been designed to include construction and maintenance of ditches to provide <br />positive drainage along the entire length of the road. <br />Water Management. Water is a major factor in most landslides or areas of potential surficial <br />instability. Proper drainage is essential in correcting or eliminating slope failures. Surface drainage <br />within the potentially unstable area can serve to facilitate drying out of the material and therefore <br />reduce the chances of further movement. In the "neck" area of Section 17, where topsoil has been <br />removed, water was not observed except as rivulets in response to snowmelt/rainfall. However, <br />surface water runoff will be controlled and positive drainage maintained along the proposed haul road <br />to eliminate future saturation of materials. Mining in this area will tend to further reduce the potential <br />for saturation of surficial materials, providing for direct discharge of any shallow groundwater from <br />adjacent areas to the pit excavation. <br />Conclusion. The area to the north of the "neck" area of Section 17, included in the area mapped as <br />Qols, has been disturbed for a number of years and contains an electrical substation and Topsoil <br />Stockpile C. Since the topsoil has been removed (1995!1996) from the neck area, no instability or <br />movement has been observed in the area. No significant active or recognizable instabilities were <br />observed during the topsoil removal in the "neck" area in the fall of 1998. Topsoil Stockpile H has not <br />experienced any movement during the spring of 1999 lone of the wettest springs in the last several <br />years). <br />In summary, SCC believes that "unloading" through topsoil removal has provided additional stability to • <br />the area and the area will be "safe" for mining and the haul road location. However, SCC will agree to <br />continue to monitor the conditions within the "neck" as the area is mined. <br />Coal Resource Protection and Conservation <br />Mining at Yoast involves extraction of a single coal seam having varying overburden depths. The <br />initial choice of mining equipment type and size was based upon the type of mining conditions, <br />production requirements, the life of the mining operation, types and thicknesses of overburden, local <br />and regional_dip, and thickness- of the, coal seam.- Experience in mining at Yoast has resulted in the <br />anticipated mix of excavation and support equipment. Auxiliary equipment has been matched to the <br />primary excavator and its capabilities. Mining activities are conducted to maximize the recovery of <br />coal while maintaining environmental integrity. <br />Duimg reserve development, all the coal encountered during didling is recorded. The correlatable and <br />estimated mineable seams are cored and analyzed. These data are utilized to finally determine <br />mineable reserves. The quality of the seams as well as their occurrence in the geologic column is <br />considered when determining whether the seam is mineable or nonmineable. <br />a <br /> <br />9c TR-21 Revised 06/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.