Laserfiche WebLink
'- <br /> <br />S <br />M-99-OOS' Response to Reclamation Permit Application Consideration 2 <br />If storm water runoff is intercepted by this operation, and is not diverted or captured in priority, it must be <br />released to stream system within three days. This may require a discharge permit form CDPHE-WQCD. <br />Otherwise the operator will need to make replacements for this evaporation, in addition to ground water <br />evaporation and losses. <br />~'// X99 <br />q~2 <br />