Laserfiche WebLink
EXIlIBIT f~ <br />1, . • <br />2. County Roads to be used by this operation shall be <br />so dcsiynatcd h}' the Connt}' T:+r~iuc•cr +ftrtr consultation with tLr <br />anplicant and shall Le hard-surfaced at the applicant's'erpenr,e <br />to the specification and approval by the County T.•ngineer. <br />3. A hydrological study will he done by a qualified <br />hydroloyical engineer to deterr,+ine that no adverse impacts to the <br />domestic and ayricultural ~•~ater wells in the area will result <br />from this operation. The exact area of the potential impacts <br />shall be determined by such enyineer. The applicant shall meet <br />all specifications of the engineer to eliminate any adverse <br />impacts if such are found to exist. <br />4.. The hydrological study and road improvement plan <br />shall be completed within 90 days from the date hereof. <br />5. If the property is not developed and used as a <br />sand and gravel extraction pit consistent with the terms and <br />conditions hereof within two years of the date hereof, this <br />approval shall become null and void and of no further force and <br />effect. <br />Exhibit "A", attached hereto and incorporated <br />herein by this reference. <br />Commissioners Hotchkiss and Tha}per voted in favor of <br />the Findings and Resolution and Commissioner Weitzel voted against <br />the same. The Findings and Resolution were duly adopted. <br />DATED this ~~ = day of ~~=~i,,,,j~~,J 19i/9, <br />as of November 28, 1979. ``77`` <br />THE BOARD OF COUNTY CO1.IMISSIONERS <br />OF THE COUNTY OF LRRI1~iER <br />By `~~ r~r~ ti%i~~~u <br />Chairman <br />(SEAL) <br />ATT E T : //////f) ~( L <br />Deputyr and Acting Clerk <br />of yaid Board <br /> <br /> <br />-9-- <br />.i <br />