Laserfiche WebLink
<br />-3- <br />detemuned: <br />b) The Board will erter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been performed upon sudr lands has <br />not been performed, and <br />ii. that fuiarrrcial warranty forfeiture proceedings described in the Ad or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, aging for the Board, will erter lands to respond to an emerg®cy anly <br />where the Division determhres that any of the conditions of Construction Material Rule 8.4.2. exist. <br />'n The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />// a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO <br />Division Director <br />