My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-07-06_PERMIT FILE - M1998059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1998059
>
1998-07-06_PERMIT FILE - M1998059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 9:58:32 AM
Creation date
11/24/2007 8:48:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998059
IBM Index Class Name
Permit File
Doc Date
7/6/1998
Doc Name
CHECK
From
L AND L READY MIX
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COSTS <br /> The following are the calculations we have come up with for the cost of sloping the <br /> banks disturbed to a 3:1, removing road surfacing gravel from 20 foot wide roads, and <br /> spreading 6 inches of topsoil over the area to be reseeded. The creek bed itself will <br /> not be seeded . The seed cost came from submitting the mix from the Soil <br /> Conservation Service to Grainland Coop, the slope grading from our heavy <br /> equipment charges to customers, including travel time from either Haxtun or Holyoke, <br /> and the reseeding charge from a local resident of Haxtun who sows seeds <br /> commercially. Although much of the bank may not be disturbed, the area calculation <br /> came from estimating 1/2 mile of bank graded from a 6 foot mined bank, 20 foot wide <br /> to a 3:1 slope, times 2 sides for approximately 3 acres and two 20 foot access roads for <br /> approximately 2 acres, for a total of 5 acres total. <br /> EQUIP. CHARGE - RECLAIM ROAD <br /> LOADER 8 HOURS @ $70.00/HOUR . . . . . . . . . . . . . . . $560.00 <br /> TRUCK TIME - HAUL & SPREAD TOPSOIL <br /> 2 HOURS @ $50.00/HOUR. . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 <br /> EQUIPMENT CHG. - RECLAIM PIT <br /> DOZER TIME - SLOPE SIDES 3:1, 24 HOURS @ <br /> $70.00/ HOUR.. . . . . . . . . . . . $1,680.00 <br /> SCARIFY GROUND 2 HOURS @ 70.00/HOUR. . . . . . . $ 140.00 <br /> HAUL & SPREAD TOPSOIL 6 HOURS @ <br /> $50.00/HOUR. . . . . . . . . . . . . . . . . . . $ 300.00 <br /> ROAD & PIT <br /> RESEED 5 ACRES @ $8.00/ACRE (EQUIP. & <br /> OPERATOR) FOR 5 ACRES . . . . . . . . . $ 40.00 <br /> SEED @ $58.00 PER ACRE . . . . . . . . . . . . . . . . . . . . . . . . $ 290.00 <br /> LABOR TO REPLACE ENTRANCE TO PASTURE <br /> 4 HOURS @ $14.00/HOUR. . . . . . . . . . . . . . . . . . . .$ 56.00 <br /> TOTAI SEQ AM MON CO TS $ 3,166.00 <br /> EXHIBIT L RECLAMATION COSTS <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.