4 ~ ' III III III IIIIIII III <br />L,~ E%HIBIT H <br />/Reclamation Costs <br />Cooper Pit <br />Activity Equipment Used <br />1. Chisel flat areas AC-16 crawler-dozer <br />to a depth of or <br />6 inches D-6 crawler-dozer <br />2. Finish grade and same <br />minor slope work. <br />Time (man hrs.) at <br />12 hrs. @ $30.00 <br />per hour <br />9 hrs. @ $30.00 <br />per hour <br />Total Reclamation Cost <br />Sub-total <br />$ 360.00 <br />$ 120.00 <br />$ 480.00 <br />These Reclamation Costs do not reflect the sloping and grading that i~ described <br />as part of the mining plan itself. The method of excavation proposed will in- <br />crease the costs of the operation due to added equipment time. These costs will <br />be twenty-five dollars ($25.00) per hour of slope work. These added ~~osts will <br />amount to approximately four thousand dollars ($4,000.00) over the lif~=_ of the <br />operation. <br /> <br />