Laserfiche WebLink
AIR POLLUTION CONTROL DIVISION <br />COLORADO DEPARTMENT OF HEA LTH <br /> <br />PRELIMINARY ANALYSIS <br />Page 4 of 7 <br />PERMIT NUMBER C-13,004(1-4) gpplicant's Name Western Slope Carhon <br />Da[e10-20-SO Review Engineer Scott J. Miller Control Engineer <br />Train and Truck Loading: <br />Q = (0.002 lb/ton)(200~,000 tons /y r) = 0.2 TPY (no controls) <br />2000 lb/ton <br />Coal Preparation Plant <br />Maximum production = 1.5 x 106 TPY <br />Conveyors (200,000 increase from hest mine) <br />Q = (0.2 lb/ton)(200,000) = 20 TPY <br />2000 lb/ton <br />• )<JO% control for partially enclosed <br />Qcontrolled - 2 TPY <br />Transfer Points (2): <br />Q = (2) (0.02 lb/ton)(1.2 x 106 TPY) = 24 TPY <br />2000 lb/ton <br />SOY- control for Boater <br />Qcontrolled - 12 TPY <br />Fefuse Transfer Points(2): <br />Q = (2)(0.02) lb/ton)(0.3 x 106 TPY) = 5 TPY <br />2000 lb/ton <br />50% control for water <br />Qcontrolled - 2.5 TPY <br />Rail Loadout' <br />• Maximum thruput = 1.5 x 106 TPY <br />APC-73 (5-76) <br />