My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111554
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:08:04 PM
Creation date
11/24/2007 8:44:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
app for air permits
Section_Exhibit Name
APPENDIX X Section X.12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHWEST CARBON CORPORATION <br />315 EAST 300 50UTI+ <br />P 0 BDX 15]6 <br />• SALT LAKE CRY. UTAM 84t 10 <br />001 574.3500 <br />Oct. 1, 1980 <br />Mr. Soott J. Miller <br />Air Pollution Control Division <br />Colorado Dept. of Health <br />125 No. 8th Street #10 <br />Grand Junction, CO 81501 <br />Re: Air Pollution Permit No. C-13,005(FD) <br />Dear Sett: <br />Thank you for your cooperation in our efforts to have the <br />Hawk's Nest Mines repermitted. Per your request I am enclosing <br />separate permit applications and apes forms for the following <br />operations at Hawk's Nest Mines. <br />• 1. East Mine and Crushing Facility (existing) <br />2. West Mine and Crushing Facility (proposed) <br />3. Coal Preparation Plant (existing) <br />4. Rail Loadout (existing) <br />As we discussed over the telephone our production from <br />both mines is expected to reach a maxicmmi of 1.5 million tons per <br />year (1.3 million tons from the East Mine and 200,000 tons from <br />the West Mine). Our wash plant has a capacity of 1.5 million tons <br />per year also, but we do not anticipate washing all of the coal. <br />Hopefully, coal produced from the west Mine will be clean and also <br />some of the coal produced from the East Dune will be clean. <br />Our loadout facility has the capacity of 55,000 tans. <br />The above information along with the air pollution crontrols <br />used at each location are depicted on the flow diagrams attached. <br />The entire operation is spread out over five (5) acres. <br />• <br />A S U! S I D I A R Y O F N O R T N W EST ENERGY C O M VAN Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.