Laserfiche WebLink
PEABODY COAL COMPANY - WESTERN DIVISION <br />h;ONITOR WELL CONSTRUCTION AND COMPLETION SUMMARY <br />Mine: Yoast <br />Location Coors: S 32951 <br />Ground Surface Elev: <br />Peabody Personnel: None <br />Type of Drilling: Rotor <br />Borehole Diameter: 6.75 <br />Monitor 41e11 Name: YOV28 • <br />W 798 Lithologic Unit Monitored:Wadge Overburden <br />7503 Total Depth: 308 feet <br />Driller: Sharpe Drilling Co. <br />~ Drilling Fluid: Air/Foam/Polymer <br />inches Completion Date: 8/5/90 <br />Well Construction Diagrams Completion Details <br />Depths) Details I Casing Specs: Blank 4" schedule 40 PVC <br />Perforated 4" schedule 40 PUC w/milislots <br />(..030 in.) <br />See Accompanying <br />Well Construction <br />Diagram <br />Blank Interval(s) 0 - 241.0 feet <br />Perforated Interval(s) 241.0 - 305.0 feet <br />Packer and/or Cement Basket Set At None <br />Bentonite Seal From 0.0 To <br />Cement Seal From To <br />Gravel Pack From 241.0 To <br />Casing Height or MP Above Ground Surface_ <br />Additional Details <br />Development Summary <br />Comments: <br />241.0 feet <br />308.0 feet <br />7-1-84 <br />