Laserfiche WebLink
PEABODY COAL COMPANY - WESTERN DIVISION <br />MONITOR WELL CONSTRUCTION AND COMPLETION SUMMARY <br /> • <br />Mine: roast Monitor Well Name: YSALB <br />Location Coors: S 3 97~i.99 W 8777.52 Lithologic Unit 14onitored: Sage Creek Alluvium <br />Ground Surface Elev: 7323.95 Total Depth; 20.o feat <br />Peabody Personnel: None (uSGS) Driller: Arguello <br />Type of Drilling:_ Rotary Drilling Fluid: air <br />Borehole Diameter: 6.75 inches Completion Date: ~o/o4/e0 <br />Well Construction Diagram Completion Details <br />Depths Details <br />iop Ca <br />0.0. GS <br />Cement <br />5.0 - <br />20.0 _ <br />Blank _ <br />casing <br />Formation <br />packer <br />Open <br />completio <br />Wire <br />round- <br />screen <br />TD <br />End Cap <br />Casing Specs: Blank 4~~ schedule 40 2vC <br />Perforated 4~~ schedule 4o slotted PvC <br />Blank Interval(s) 0.0 - 5.o feet <br />Perforated Interval(s) 5.0 - 2D.o f <br />Packer and/or Cement Basket Set At <br />0 feet <br />Bentonite Seal From To <br />Cement Seal From 0'0 To 5.0 <br />Gravel Pack From None To <br />Casing Heigfit or MP Above Ground Surface <br />Additional Details <br />Development Summary <br />Comments: <br />7-1-18 <br />