Laserfiche WebLink
6.4.4 Exhibit D -Mining Plan <br /> VOLUME OF VOLUME OF <br /> STOCKPILE ' <br />SITE LOCATION ACTIVITY MATERIAL STOCKPILE <br /> LOCATION <br />REMOVED [yd'] <br />[yd~] <br />Phase I -Cell 3 Strip Topsoil and Southeast boundary of 11,000 5,600 <br /> Stockpile Portion Cell 3 <br />Phase I -Cell 3 Strip Overburden N/A 180,740 <br />Phase 1-Cell 4 Strip Topsoi! and Perimeter of Cell 4 10,500 1,600 <br /> Stockpile Portion <br />Phase I -Cell 4 Strip Overburden N/A 126,810 <br />Phase II -Cells 1, Install Perimeter Adjacent to trench 1,090 1,090 <br />2, and 3 Drain <br />Phase II -Cells 1, Construct Slurry Adjacent to trench 14,150 14,150 <br />2, and 3 Wall <br />Phase II -East Strip Topsoil N/A 4,900 <br />Half of Cell 1 <br />Phase II -East Strip Overburden West Half of Cell 1 52,000 52,000' <br />Half of Cell 1 <br />Phase tl -West Strip Topsoil N/A 4,900 <br />Half of Cell 1 <br />Phase II -West Strip Overburden N/A 52,000 <br />Half of Cell 1 <br />Phase II -Cell 2 Strip Topsoil and Northeast and 7,300 3,800 <br /> Stockpile Portion southwest boundaries & 1,000 <br /> of Cell 2 <br />Phase Il -Cell 2 Strip Overburden N/A 61,OD0 <br />Phase II -Cell 3 Strip Topsoil and Adjacent to working 9,200 9,200 <br /> Stockpile excavation <br />Phase II -Cell 3 Strip Overburden N/A 60,000 <br />' Material refers to topsoil or overburden, as relevant <br />z Maximum stockpile in Phase 1 occurring at any one time <br />a Maximum stockpile in Phase II occurring at any one time <br />November 16, 2006 Bokelman/Watters Pit <br />Page 4 of 36 Regular 112 Permit Application <br />