My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111436
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:59 PM
Creation date
11/24/2007 8:35:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
Permit File
Doc Date
2/14/1984
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' E~CHI TT D <br />i`^~INIlVG PL{1iV <br />' The mining cperatier. will be dry. The excavati n will be <br />pumped dry after reaching the water table. <br />t Mining will proceed from the eastern edge ^f the p eperty .and <br /> move tcward the west. Topsoil will be stripped by s rapers nr <br /> front end loaders and stockpiled on locations shown on the mi ring <br /> plan map. Aggregate to be mired will be removed by drag line <br />t and deposited in the area of the process=ng plant or n ar the end <br /> 04 the conveyor which will tran.spcrt the material to the p lant <br /> site. As mining progresses westward, the plant wil be moved <br />t ahead of the mining ar=a. <br />Earthmoving will be conducted ir, three phases. Fl~ase I will <br /> 6e the removal and stocF:piling of topsoil and cverburd n. Phase <br /> Ii will be the removal ^f the aggregate ;naterial ~y drac.line. <br /> ?tease IiI lYlll be the replacement of overburden an topsail. <br /> 'chases I anal II will 6e conducted by scrapers, (rent nd loaders <br />' cr dragiine_ <br /> There is no water di•:ersier. expected. A drainage itch which <br /> runs through the property from south to north will be llowed to <br /> continue to drain into the er.cavated position of he min/ng <br /> eperaticn a nd then nut of the excavation back into ~t=_ nermai <br /> drainage if flow is sufficient enough to raise the wet r level to <br />' the assigned discharge level. <br />~~ <br /> <br />1 <br />M <br /> <br /> <br /> <br /> <br />The ma::imum area to be mined during acne year periled will be <br />11.5 acre=_. The plant site wil'_ require appr^>:ime.teiy 3 acres. <br />The access road will 6e no more than ~SGO fret long an ~4 feet <br />will be for a ma::imw^. area of 1.4 acres. The area o= the road <br />disturbance will reduce as the mining moves westward. <br />T?-~e timetable of mining will take place in five tsge~ as <br />st~o.~r, cn the mining :nap. Each stage is e;:?ected to b finished <br />d~.ring ^ne •/ear cf aperatien. A str'.p appre:<imately 4 Y 100' <br />w?1. be mined each mcnth. Each stage will be coined fr m East t^ <br />!fie=_t. <br />0•:erburdur. and t=~psoii varies from ~~.5' to 7° wi*_h <br />depth e; about _.5'. Ma:;imum depth tc the bct±c <br />_=,ggre;ate :ne.teriai i=_ __ <br />The stratum immed:.atel; ber;eat:~ the material to be <br />the Pierr= Shale. <br />average <br />of the <br />mi red i=_ <br />7-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.