Laserfiche WebLink
T~metab~e <br /> <br />1 <br /> <br />Reclamation. will be continuous t!-;ro;~ghout t <br />operation. As shoreline is created (aastern edge fir=_ <br />mir.ir.g progresses westward, the topsei! v:ill be repl <br />the bar.l:s anal seeded as soot. as practical. The f <br />approximately 200 lineal feet of shoreline will be c <br />approximately 1000 Beet per year (SUU' north and <br />until the fifth year when about 200 feet will 5e e <br />roc l a i fined . <br />Final grading will be a 3h:ly slope from the undi <br />*_0 10 feet below waterline. <br />e mining <br />), and the <br />cod along <br />rst year, <br />Bated and <br />~' SOUth) <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />1 <br />1 <br />1 <br /> <br /> <br /> <br />posed ar.d <br />ed area <br />Seeding, fertilization, revegetation and topsoilin~ have been <br />previously discussed in this section. <br />E-4 <br />