Laserfiche WebLink
• <br />-3- <br />determined: <br />b) The Board will eater the lands to perform reclamation only if the Board has <br />nar bear performed, and <br />i. that reclamation required by law to have bear performed upon such lands has <br />u. that financial warranty forfieUure proccedmgs described ur the Ad or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, ailing for the Board, will enter lands to respond to an emergency only <br />where the Division detemtines that any ofthe conditions of Conswction Material Rule 8.4.2. exist. <br />~ The additional conditions s~ forth in the attached rider, if any, are incorporated herein by <br />reference. <br />// a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMAT70N BOARD <br />COLORADO DEPARTY~NT OF NATURAL RESOURCES <br />M]CHAEL B. <br />Division Director <br />