My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111363
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:55 PM
Creation date
11/24/2007 8:30:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
SECTION III MINE DESCRIPTION
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The room and pillar equipment consists of continuous miner units, each containing a continuous miner, <br />two shuttle cars, one roof bolter and a scoop. <br />An underground electrical distribution system delivers electrical power at 13,800 volts to the points of <br />use in the mine. Transformers are used to obtain the required voltages for the mining equipment. <br />Although the coal seams are not expected to produce significant amounts of groundwater, the mine <br />drainage system is designed to dewater the mine quickly enough to prevent any safety hazard to <br />workers or equipment. <br />III.A.5 Roof Control The roof control plan, which has been submitted to and approved by the Federal <br />Mine Safety and Health Administration (MSHA) contains the following provisions: <br />• Entries will be driven on 20 to 150-foot centers, cross cuts on 50 to 200-foot centers. <br />Entries and crosscuts will be 16-22 feet wide. Full extraction may be practical during room <br />and pillar mining. <br />• The major means of roof support will be provided by roof bolts 410 feet in length installed <br />vertically. Some areas may require cable trusses and/or angled roof bolts to support <br />incompetent or unstable roof material. Roof bolts will be installed on 5-foot centers. <br />• Certain areas will also be supported by wood posts and cribs. <br />III.A.S Mining Plan A complete description of the mining system is included previously in this section. <br />BME intends to extract coal from the D coal seam by utilizing both longwall and room and pillar, with <br />pillar extraction methods. The mine is being developed by driving a series of mains and submains with <br />continuous miners. These entries serve as the arteries for coal conveying and ventilation. The mains <br />and submains, which will remain open for the life of the mine, are supported by roof bolts. Additional <br />support may include timbers, steel arches, steel mats, steel mesh and shotcrete. <br />Permit Renewal #3 (Rev, 8/99) III-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.