Laserfiche WebLink
OCT-e5-1994 12~FJ5 FROhI C61-104TH TO 9891655 P.~33 <br />:- • • <br />4, Any modification to t2:e approved mining and reclamation plan Prom those described <br />In YouY approved applir.,erinn requires you to oubmit a permit modiPieetion an[1 ubcaia <br />approval from the Hoard or Office; <br />_~S. It is your reapoueiL ilicy co nociSy the Orrice of any changes in your address or <br />phone number; <br />N~ 6, Bpon permit issuance and prior to beginning oa-site miriiag activity, you must <br />post a sign at the entrance of the mine site, vrhich shall be clearly visible from the <br />arses road, with Uie toiloaing inlormatioa (itule 3.1.12): <br />a. the name of t`~e operator; <br />a statement that a reclamation permit for the operation has been issued by <br />the Colorado Miacd Lvd R.eelmm~tion Hoard; aud, <br />o. the permit number. <br />7. The boundaries oP the permit boundary area must be marked by monuments or other <br />marksra hat ere clearly visible nod adequate to deliueate such bovadarie6 prior to <br />site disturbance. <br />~p~,,,8. 2t is a provision of this permit that the operations will be conducted in <br />accordance wit.`3 the terms sad conditions listed in year appiicatioa, ae well as with <br />the provisions ox the Act a::d the Mineral Rules and Regulations is effect at the time <br />the permit is issued. <br />~so <br />9. Annually, on the anniversary date of permit issuance, you must su3mit an annual <br />fee 1$t~~$, and an annual ra[inrh which includaa • map desaribiag the acreage nffacted <br />and the acreage rer-laimed to date (if there are changes fscm, the previous year), any <br />monitoring required by the Reclamation Plan to be submitted annually on the anniversary <br />date ox the peraut approval. Anauai _ees aze for the prer_ous year a permit is h~ld- <br />For example, a permit with the aariiversa_ry date of July 1, 1995, the axuzual fee is for <br />the period of July 1, 1994 throtu3h Juuc 3D, 1995. Failure CO au)ai[ your annual fee <br />and report ay the permit anniversary date may result is a civil penalty, revocation of <br />your Dermit, and forfeiture of year finartriwl warranty. It is your racpoaeibility, se <br />as operator, to continue to pay your aarual fee to the Office until the Hoard releases <br />you from your total reclamation responsibility. <br />TOTaL P.03 <br />