Laserfiche WebLink
6. Industrial Activity: Describe the primary indus[rial activities which take place on site (e.g., sand and gravel mining, gypsum mining, sand <br />washing, gravel crushing, stationary or mobile asphalUconcre[e batch plants, etc.). Indicate the status of [he facility (active, inactive, being <br />reclaimed, etc.) Sand and Gravel mining Material will be loaded on a conveyor and transported to a neiehborine Lafarge pit for orocessine <br />The facility is scheduled to begin operating in 2004. <br />7. Other environmental Permits: Does this facility curcently have any other environptentat permits, or is it subject to regulation, under either of <br />the following programs? <br />Petmi[ Name Yes No Applied For, Date Permi[ No. <br />a.) Colorado Division of Minerals and Geology <br />former) MLRD X Being applied for in 2003 <br />b.) Under round In'ection Control X <br />c.) Dredge or fill permit under Section 404 of the Clean <br />Water Act CWA Arm Co s of En ineers X <br />d. Resource Conservation and Recove Act RCRA X <br />e. CDPS Stomtwater X <br />f. Colorado State Air Pollution Emission X A lied for in Jul 2003 <br />g.) Other <br />If Yes [o item 7.a), please include Colorado Division of Minerals and Geology (Mined Land Reclamation Board) permit amiversary date: <br />8. Stormwater vs. Process Water <br />Do you discharge any of [he following process generated was[ewa[ers from your facility, to state waters? <br />®No^ Yes Product wash waters <br />®No^ YaMaimenance/equipment wash waters <br />®No^ Yes Transport waters (e.g., slurries) <br />®No^Yes Scrubber waters (crushers or classifiers} <br />^No® YesMine dewatering (groundwater and/or runoff from the mine) <br />If you answered YES [o any of these questions, continue on to Item 9. <br />If you answered NO to all of these questions, skip to Item 18. <br />9. Location map: A location map designating the facility property, discharge points and receiving waters shall be submitted. The map shall be <br />from a 72 or 15 minute USGS quad sheet, or a map of comparable scale. A north arrow shall be shown. The map must be on paper 8 2 x 11 <br />inches. <br />I0. Site Sketch: A legible general sketch of [he site shall be submitted, showing appurtenam facilities (buildings, ponds, diversion ditches, <br />stockpiles, etc.), stream location, numbered discharge points, sampling and Flow monitoring points. The map mtut 6e on paper 8 2 x 11 <br />inches. The outfalls shall be labeled to correspond with the numbers listed in 15. <br />2 <br />