My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111234
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:49 PM
Creation date
11/24/2007 8:24:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
3/9/1978
Doc Name
STATUS OUR FN 77-546 AND 77-547
From
RECLAMATION SPECIALIST
To
JOHN HORVATH JR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> HORVATH PIT Ill - /177-546 <br /> 1. Mining Plan: <br /> What amounts of topsoil and overburden will be removed? (express in <br /> ranges i.e. 1" - 4"). How will it be removed? (What eq~.ripment?) <br /> How will gravel be removed? To what d epth will gravel be removed? <br /> Will gravel be crushed? How long will topsoil be stockpiled? Wi11 <br /> the pit need to be dewatered? At what depth does the watertable lie? <br /> What is the access to the pit area? <br /> 2. Reclamation Plan: <br />r <br /> How long caill the pit be in existence? To what depth will topsoil and <br /> overburden be replaced? What will the final slopes of the pit be? <br /> Will all recommendations made by the S CS be followed? (topsoil replaced, <br /> slopes, etc.) What equipment will be utilized? The SCS seeding rates <br /> are for individual species, a specific seed mixture with rates should <br /> be submitted. Will all species listed be utilized? A staff recommendation <br /> for seeding mixture is as follows: <br />8 lbs/ac Smooth Brome <br />1 lb/ac Timothy <br />2 lbs/ac Orchard Grass <br />5 lbs/ac Alfalfa <br />HORVATH PIT tit - 1177-547 <br />1. Mining Plan: <br />To what depth will the gravel be removed? What amounts of topsoil and <br />~ overburden will be removed? (express in ranges i.e. 1" - 4") Wi11 <br />gravel be crushed? Will dewatering of the pit be necessary? What <br />equipment will be utilized in the mining operation? How long will top- <br />soil be stockpiled? What is the access to the pit? <br />2. When will the pit be completed? What water rights are available to fill <br />the pit? Will recommendations by the SCS be followed throughout the <br />reclamation plan? Is there going to be any revegetation of pond banks? <br />What about replacement of topsoil or a viable plant growth medium in <br />those areas or is that a problem? What trees and shrubs will be planted <br />according to SCS recommendations. (rates, species, etc.) How deep will <br />the pond be? Will access be maintained? <br />•i <br /> <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.