My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE111192
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE111192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:47 PM
Creation date
11/24/2007 8:20:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
Permit File
Doc Date
12/8/1994
Doc Name
PN M-93-041 DOWE FLATS MINE SOUTHDOWN INC COMPLIANCE WITH BOARD STIPULIATION 5
From
AGRA EARTH & ENVIRONMENTAL
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />~A G R A <br />Earth & Environmental <br />December 6, 1994 <br />III IIIIIIIIIIIII III <br />FiECEI~~ED <br />DEC 0 d 1994 <br />• ~=or^r2s~ ~i ~ e. <br />AGRA Earth & <br />Environmental, Inc. <br />17307 W. Colfax Avenue <br />Suite 170 <br />Golden, Colorado 80401 <br />Tel (303)277-9988 <br />Fax (303)277-9955 <br />Mr. Bill York-Feirn ) AGRA Project E94-7033 <br />Colorado Division of Minerals and ~pBlotg~ Minerals & Geo ogy <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Permit No. M-93-041, Dowe Flats Mine, Southdown, Inc., <br />Compliance with Board Stipulation No. 5. <br />Dear Bill: <br />Stipulation No. 5 for the referenced permit requires the operator to provide proof as to who <br />is responsible for damage to structures within 200 ft. of the affected area. The only <br />"structures" within 200 ft. of the ditch crossings are the ditches themselves. Attached to this <br />letter are agreements with the four ditch companies (Highland, Rough and Ready, Palmerton <br />and Supply. The ditch crossing designs and construction plans have been reviewed by the <br />ditch company boards, their engineers and attorneys. Agreement has been reached and we <br />are awaiting signatures at the neM monthly ditch company board meetings (I will forward the <br />executed copies when I receive them). <br />These agreements are submitted as proof that mine-related construction will not damage the <br />ditches and that the owners of the structures have agreed with Southdowns' designs and <br />construction plans. <br />Sincerely, <br />AGRA Eart/h & Environmental, Inc. <br />~~~1 ~ ~~ <br />I <br />r <br />Paul Banks <br />Project Manager <br />Attachments <br />cc: John Lohr <br />Engineering 8 Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.