Laserfiche WebLink
TABLE 13-3-10 <br /> Weighted CP Factor <br /> Pond 005 - Sus-3 <br /> a <br />Vegetation Type <br />CP <br />Area (ac.) <br /> Mixed Brush 0.003 16.5 <br /> Sagebrush 0.003 2.5 <br /> Western Wheatgrass 0.006 0.8 <br /> Steep Mountain Brush 0.006 0.8 <br /> Haul Road 0.500 11_1 <br /> Total 31.7 <br /> Weighted Average LP = 5.618 = 0.177 <br /> 31.7 <br />C~ <br />• <br />CP x Area <br />0.050 <br />0.008 <br />0.005 <br />0.005 <br />5.550 <br />5.618 <br />Storage Lapacity <br />r <br />The storage capacity was also analyzed using the SEDCAD computer program. Results of the <br />SEDCAO model show the storm runoff volume from the 10-year, 24-hour precipitation event <br />to be 4.64 ac-f t. The po nding area is designed [o store 5.8 ac-ft of sediment. There <br />will be no discharge through the emergency spillway during the 10-year, 24-hour storm <br />event. In addition, [here will be adequate freeboard from the emergency spillway to the <br />[op of embankment during the 100-year, 24-hour storm event. Table 13-3-11 is a summary of <br />the designed storage capacity. <br />TABLE 13-3-11 <br />Preliminary Design Storage Capacity Summary <br />Pond 005 <br />Capacity <br />Elevation Stage (AC.-Ft.) Description <br />6855.0 0 0.00 <br />6872.1 17.1 5.8 <br />6873.0 18.0 6.5 <br />6874.0 19.0 7.4 <br />6875.2 20.2 8.5 <br />6875.6 20.6 8.8 <br />6880.0 25.0 13.8 <br />Bottom of Pond Excavation <br />t00X Sediment Storage, and <br />Elevation of Principal Spillway <br />10-Yr, 24-Hr. Peak Stage <br />Crest of Emergency Spillway <br />25 -Yr., 24-Hr. Peak Stage <br />100-Yr., 24-Hr. Peak Stage <br />iop of Embankment <br />13-3-11 Revised 03/13/92 <br />