Laserfiche WebLink
C.M4AS Colorado, Inc. <br />Loawora Distal Operations <br />LONGMONT DISTEL OPER~.TIONS <br />FOURTH AMENDMENT OP IJSR-877 <br />September, 2000 <br />RESPONSE TO USR APPLICATION REQUIREMENTS <br />Page 1 <br />1. A completed, signed original t'SR application form, 24 copies and the required applicat on <br />fee are attzched. <br />2. A derailed discussion of the mining plan is contained in Exhibit D, Attachm^.nt 1 (copy of <br />Division ofbfinerals and Geology 1 L2 (DMG) Permit A.pclicalion). <br />a) The types and numbers of equipment aze as described in USR-877. No change in <br />equipment requirements is proposed as part of this amend Went. <br />b) Vo change in employment or working hows is proposed as part of this amendment. <br />c) The mine will be operated as a dry' pit. The resource u^ 11 be dewatered prior to minis ;. <br />d) .No change in traffic patterns or local road use is proposed as part of this amendment. <br />CP,biAS Colorado, Inc. has a Weld CotmtyRoad Main:er,anee and Improvements <br />Agreement for current operations. A copy of the agreente..tt is provided in Addendum 1 of <br />the a[tached DMG Permit Application. <br />e) `he size of the individual mining areas is discussed in Exhibit D, Attachment 1. <br />Ap~roximatcly 142 acres of !and on the Peschel Properly will be mined in Phase 1. At the <br />completion of mining in tl[is azca, approximately 98 acres on the property will be mtned in <br />Phz.sc 2. Approximately 10 acres of land in the Distal pro~~erty, an area that was previously <br />permitted, will be mired in conjunction with or at the completion ofthe Longmont property. <br />f) Phase 1, the Peschel property will begin at the contpletinn of current mining operation!; in <br />the Bigelow property, in early 2001, and is expected to take approximately 3 to 4 years. <br />Mining of the Longmont property will begin at the completion of the Peschel property. It is <br />expected to [eke approximately 3 to 4 years. Mitring of th<; Distal expansion is expected to <br />take approximately U.i yeazs. This area will be mined i[r conjunction with or at the <br />completion of the Longmont property. The total expansion operation proposed in this <br />perz~it application is expected to take approximately 7 :0 9 yeazs and to be completed by <br />200'7 to 2009. <br />l~St2K0~CO4M10`IXilCncll~PmjaIW2D2~U5A Applico[lan Requvemnrtc.~a <br />