Laserfiche WebLink
Ancillary Facilities <br />A 24-foot by 62-foot mobile trailer is proved to house office and change <br />facilities. The office/change building is located along the western margin <br />of the facilities area. The trailer is insulated, electrically heated, <br />lighted and ventilated. <br />Other ancillary facilities include the following: <br />• 2 Powerhouses, one adjacent to the crusher building (on the northwest <br />side) and the second next to the train loadout structure - these <br />buildings are shown on Exhibit 12-1 (Revision 9, dated 8/99) and <br />Exhibit 12-2 (Revision 5, dated 8/99) as "metal building." <br />• Water storage tank <br />• Dust suppression pressure tank building, which is located adjacent to <br />the water storage tank - this building is shown on Exhibit 12-1 <br />(Revision 9, dated 8/99) and Exhibit 12-2 (Revision 5, dated 6/99) as <br />"metal building." <br />• Dust suppression system building, which is located adjacent to the <br />crusher building (on the southeast side) - this building is shown on <br />Exhibit 12-1 (Revision 9, dated 8/99) and Exhibit 12-2 (Revision 5, <br />dated B/99) as "metal building." <br /> <br />TR-D7 7 Revised 06/06 <br />