Laserfiche WebLink
i• <br />PEAK FLOW CALCULATIONS <br />Peak flow calculations were compiled with the computer program STORM version 6.21. <br />Peak flow calculations for the site ditches follow this sheet. The peak flow from other <br />ditches or culverts is added to the calculated peak flow for each ditch if appropriate. <br />The drainage areas are presented on the Sedimentation Control Plan, Map No. 20. <br />. Details of the site ditches are presented on the Drainage Plans Sheet 1 of 4 through 4 <br />of 4. The design ditches include. <br />Ditches 61 - B37 <br />Ditches C1 - C24 <br />Ditches F-1 - F-3 <br />Ditches G-1 - G-2 <br />PR-07 Exh-8 - 33 - ozios <br />