Laserfiche WebLink
11 <br />PEAK FLOW CALCULATIONS <br />Peak flow calculations were compiled with the computer program STORM version 6.21. <br />Peak flow calculations for the following areas follow this sheet. The drainage areas are <br />presented on the Sedimentation Control Plan, Map No. 20. The Pond A Drainage was <br />deleted from the design. All drainage from Pond A is now collected into the Pond B <br />Drainage. <br />Pond B Drainage <br />Pond C Drainage <br />Drainage Area D <br />Drainage Area E <br />PR-07 EXh-$ - 2O - 2/03 <br />