Laserfiche WebLink
• Ditch D-F1 & Culvert GF1 <br />Ditch D-F1 is a continuation of the haul road ditch beyond sediment pond C. There is <br />virtually no drainage area for this ditch portion because all of the upland drainage is <br />handled by the gob pile ditches. For the design of D-F1 see page 8-74 and the ditch <br />summary page 8-29. For the design of culvert GF1 see the culvert summary page <br />8-31. <br />Ditch D-F2 and Culvert C-F2 <br />See page 8-75 and the ditch summary page 8-29. For the design of culvert C-F2 see the culvert <br />summary page 8-31. <br />Ditch D-F3 <br />See page 8-76 and the ditch summary page 8-29 <br />Ditch D-G1 <br />See page 8-77 and the ditch summary page 8-29. <br />Ditch D-G2 8 Culvert GG4 <br />See page 8-78 and the ditch summary page 8-29. For the design of culvert GG4 see the culvert <br />summary page 8-31. <br />• Culvert C-G1 <br />For the design of culvert C-G1 see page 8-32i and the culvert summary page 8-31. <br />Culvert GG2 <br />For the design of culvert GG2 see page 8-32ii and the culvert summary page 8-31. <br />u <br />APP~o~ED <br />PR-07 5/1203 EXH-8 -13 4/03 <br />